Large Span Prefab Prefab Metal Construction Warehouse Building

Product Details
Customization: Available
Size: According to Customers′ Requirement
MOQ: 200sq.M.
Manufacturer/Factory, Trading Company, Group Corporation
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000
Export Year
2004-03-01
  • Large Span Prefab Prefab Metal Construction Warehouse Building
  • Large Span Prefab Prefab Metal Construction Warehouse Building
  • Large Span Prefab Prefab Metal Construction Warehouse Building
  • Large Span Prefab Prefab Metal Construction Warehouse Building
  • Large Span Prefab Prefab Metal Construction Warehouse Building
  • Large Span Prefab Prefab Metal Construction Warehouse Building
Find Similar Products

Basic Info.

Model NO.
KXD-SSW1513
Roof
Metal Roof
Wall
Color Steel Sheet or Sandwich Panel
Frame
H Steel, Z or C Purlin
Window
Aluminium Alloy or PVC
Door
Sliding Door or Roll up
QC
SGS BV
Delivery Time
About 35 Days
Purlin
Galvanizd C Section Steel
Installation
Provide
Material
Steel Structure
Usage
Warehouse, Villa, Dormitories
Certification
ISO, CE, SGS
Customized
Customized
Transport Package
Seaworthy Package
Specification
SGS ISO BV
Trademark
KXD
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
2000ton/Month

Product Description

Clear span Prefab Metal Construction Workshop/Warehouse

Large Span Prefab Prefab Metal Construction Warehouse Building

Our workshop 

Large Span Prefab Prefab Metal Construction Warehouse Building
Large Span Prefab Prefab Metal Construction Warehouse Building

I.Material grade

 1.Carbon structural steel: Q235.

 2.High-strength structural steel :Q345

 3.Special purpose steel t

II.Quality standard

 1.Certificate: ISO9001:2000

 2.Code for design of steel structure: GB 50017-2003

 3.Technical code of cold-formed thin-wall steel structure: GB50018-2002

 4.Load code for the design of building structures. GB 50009-2006

 5.Construction quality acceptance of steel: GB50205-2001

 6.Code for design, construction and acceptance of high strength for steel  structure, JGJ82-2011

 7.Technical specification for welding of steel structure building: JGJ 81-2002

 8.Technical specification for steel Structures of tall buildings: (JGJ99-98)

III. Structure Assembly

1.Steel Framework:

   Component: H-Column, H-Beam & C/Z-Purlin

   Connection of steel structure method: Welding, Bolted

2.Surface treatment: Painting, Galvanized

3.Roof &Wall: colored steel tiles or colored steel sandwich panel as per request

4.Doors: Rolling or Pushing, as reques.
Large Span Prefab Prefab Metal Construction Warehouse Building

IV Steel characteristics

1.Environmental protection

2.Higher reliability of steel work

3.Strong quakeproof

4.Higher degree of industrialization

5.Quick to be assembled accurately

6.Larger interior space
Large Span Prefab Prefab Metal Construction Warehouse Building


Steel structure project showing:

Large Span Prefab Prefab Metal Construction Warehouse Building
Large Span Prefab Prefab Metal Construction Warehouse Building
Large Span Prefab Prefab Metal Construction Warehouse Building
Large Span Prefab Prefab Metal Construction Warehouse Building
Large Span Prefab Prefab Metal Construction Warehouse Building
Large Span Prefab Prefab Metal Construction Warehouse Building

ast build 

Steel structure come pre-welded, pre-drilled and pre-punched at our factory. just need to connect by bolts with the accuracy of steel components , no need to weld in construction site.

One 1000 sqaure meter steel structure building just needs around 25 days to install with 5 workers. 

Low cost  Requires less maintenance than other traditional building method. Unit price range from FOB Qingdao USD19.99 to USD80 per square meter, it cost about 50% less than traditional construction. Moreover, 98% of all steel structure can be recycled into new steel products without reducing physical properties. 
 Anti-seismic and  wind resistance Can withstand a grade 8 earthquake, wind resistance 300km/h.
Longer service time  more than 50 years. 
Health and safety  Steel structure building is manufactured at the factory and rapid installation on the construction site by skilled personnel making steel structure safe. There is very little noise and dust. 
Large Span Prefab Prefab Metal Construction Warehouse Building

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier