Customization: | Available |
---|---|
After-sales Service: | Over 50 Year Limited Warranty |
Characteristics Of Goods: | Finished Goods Warehouse |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Qingdao KXD Steel Structure Co.,Ltd has been an industry leader for prefabricated steel building with pre-eminence in custom designs and fabrication capabilities.With more than 30-year-limted warranty in steel building manufacturing and design,KXD's products have been exported to more than 80 countries with good quality and customer service.
KXD's integrated products line include pre-engineered steel building,prefabricated house,container/modular house and poultry house whether for industrial,commercial,agricultural or residential applications.
KXD has erected a variety of steel buildings for workshop/warehouse,prefab house and container house projects around the globe to meet up our client's needs.
Steel is the most important building material in the world because of its light weight and high strength. Steel has the highest strength-to-weight ratio of all building materials, meaning that its members add strength without adding stress to the building frame.
This advantage gives our engineers team more flexibility when designing structure. The steel church building be easily modified the layout and designed clear span to meet lager space requirement. Another major benefit of steel building is its lower cost and less waste compared to traditional building materials. More larger the building is, more cost will be saved. Not only the steel price is lower, but also the groundwork will be smaller. Also, As an environmentally friendly material, steel almost no waste and can reduce energy costs and save you a lot of money over time.
Prefab Building Steel Structure System Inspection | ||
Main components | Base | Cement and steel foundation bolts |
Main frame | H-section steel | |
Material | Q235B, Q345B or others as buyers' requests. | |
Purlin | C / Z Steel: Size from C120~C320, Z100~Z20 | |
Bracing | X-type or other type bracing made from angle, round pipe | |
Bolt | Plain bolt and High-strength bolt | |
Roof & wall | Sandwich panel or Single steel sheet | |
Door | Sliding door / Rolling door / Securing door | |
Window | Aluminium alloy frame | |
Surface | Total four layers of Anti-rust Painting or Galvanized | |
Application | 1. workshop/ warehouse/factory 2. Storage/ garage/shed,/hanger 3. Animal Farm (please confirm what kind of animal) 4. steel building, modular house 5. Steel H-column and steel H-beam Structure 6. High rise building project, like tank tower 7. Others steel structure buildings materials |
|
Packing | Main steel frame without packing load in 40' OT Steel pallet packing load in 20 / 40GP, HQ |
|
Drawing: | AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. to design | |
Design Parameters |
If you need our design, please help to confirm as belows for quickly quotation. | |
1, Project location(country/area) | ||
2, Size( Length × Width × Height cm) | ||
3, Snow load (Max. snow thickness ) | ||
4, Wind load (Max. Wind speed Kn/m2 km/h m/s) | ||
5, Seismic magnitude | ||
6, Middle Column allowed or not | ||
7, Brickwall allowed or not (cm) | ||
8, Door&Window Quantity&Size | ||
9, Crane allowed or not? Tons? |
Warehouse/Workshop |
Shopping mall |
Multi-layers building |
Hangar |
Storage/Shed/Carport |
Sports Stadium / showing room |
Residential House/ Villa / Dormitory |
Poultry house |
Office building |
Component | Specification | |
Main Steel Frame | Column | Q235, Q355 (Hot Rollled / Welded H Section Steel) |
Beam | Q235, Q355 (Hot Rollled / Welded H Section Steel) | |
Secondary Frame | Purlin | Q235, Q355 C and Z purlin |
Knee brace | Q235 Angle Steel | |
Tie Rod | Q235 Circular Steel Pipe | |
Brace | Q235 Round Bar | |
Vertical and Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | |
Maintenance system | Roof Panel | Steel Sheet Insulated Sandwich Panel (EPS /Glass-Fiber / Rock-Wool / Pu) |
Wall Panel | Steel Sheet Insulated Sandwich Panel (EPS /Glass-Fiber / Rock-Wool / Pu) Decorative Panel (Glass Curtain, Aluminmum Panel |
|
Accessories | Window | Plastic steel / Aluminium Alloy / PVC Window |
Door | Sliding Door / Electric Rolling Up Shutte / Metal Door / Personal Door | |
Rain-spout | PVC | |
Live load on Roof | In 120kg/Sqm (Color steel panel surrounded) | |
Wind Resistance Grade | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure Usage | Up to 50 years | |
Temperature | Suitable temperature.-50°C~+50°C | |
Certification | CE, SGS,ISO9001:2008,ISO14001:2004 | |
Finishing Options | Vast array of colors and textures available | |
Paint Options | Alkyd painting / Epoxy painting / Hot Dipping Galvanized |
Till now, we already finished thousands of different typs projects, with different standards, to various countries. With rich experience, we could offer professional suggestions and plans as your exact demands. So no matter your have a comprehensive construction plan or only one idea, we will manage all for you.
Steel building Package:
The packing method for main steel frame use steel pallet, This method packing can better protect the steel frame, and alos the loading and unloading will be fast and convenient since it could be taken as a whole.(see attached photo). The best advantage can save the quantity of shipping contaier, so it will save the cost of ocean freight, save unlading time and cost.
Installation:
Upon customer request, we could send our engineer to guide the installation, or a small team to install at the same time, teaching local workers to install, or enough workers to install all the goods by ourselves. It depends on whether the cost is economic.
More details you need, feel free to contact
Sue Sun (Project Manager)
Always on line for you!