Customization: | Available |
---|---|
After-sales Service: | Over 5 Year Limited Warranty |
Installation: | Techinical Guide or Turnkey Projects |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Component | Specification | |
Main Steel Frame | Column | Q235, Q355 (Hot Rollled / Welded H Section Steel) |
Beam | Q235, Q355 (Hot Rollled / Welded H Section Steel) | |
Secondary Frame | Purlin | Q235, Q355 C and Z purlin |
Knee brace | Q235 Angle Steel | |
Tie Rod | Q235 Circular Steel Pipe | |
Brace | Q235 Round Bar | |
Vertical and Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | |
Maintenance system | Roof Panel | Steel Sheet Insulated Sandwich Panel (EPS /Glass-Fiber / Rock-Wool / Pu) |
Wall Panel | Steel Sheet Insulated Sandwich Panel (EPS /Glass-Fiber / Rock-Wool / Pu) Decorative Panel (Glass Curtain, Aluminmum Panel |
|
Accessories | Window | Plastic steel / Aluminium Alloy / PVC Window |
Door | Sliding Door / Electric Rolling Up Shutte / Metal Door / Personal Door | |
Rain-spout | PVC | |
Live load on Roof | In 120kg/Sqm (Color steel panel surrounded) | |
Wind Resistance Grade | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure Usage | Up to 50 years | |
Temperature | Suitable temperature.-50°C~+50°C | |
Certification | CE, SGS,ISO9001:2008,ISO14001:2004 | |
Finishing Options | Vast array of colors and textures available | |
Paint Options | Alkyd painting / Epoxy painting / Hot Dipping Galvanized |
Rich experiences for various prefab steel buidlings exporting:
The packing method for main steel frame use steel pallet, This method packing can better protect the steel frame, and alos the loading and unloading will be fast and convenient since it could be taken as a whole.(see attached photo). The best advantage can save the quantity of shipping contaier, so it will save the cost of ocean freight, save unlading time and cost
Upon customer request, we could send our engineer to guide the installation, or a small team to install at the same time, teaching local workers to install, or enough workers to install all the goods by ourselves. It depends on whether the cost is economic.