Project Introduction:
Site:Peru
Designor&contractor:KXD
Size:10.3m*11.45*6.5m(2 floors)
Interior layout:2 apartments in total.
Ground floor:kitchen,dining room,small bathroom,living room
First floor:3 bedrooms+bathroom
Technical datas of Peru steel frame structure residential Building Construction
I.Main frame
The main frame includes the column and mezzanine girder/beam.The column is Q235, rectangular hollow section and mezzanine beam is Q235, hot-rolling H section steel.
II.Flooring system:
Decking floor |
688 type,1mm |
Mudguard sheet |
2mm galvanized bending |
Stud |
φ16 |
The floor systems are covered:
- Composite beams and composite slabs with steel decking
- Long-span composite beams often with service openings
- Cellular composite beams with composite slabs and steel decking
- Integrated beams with precast concrete units
- Composite and non-composite beams with precast concrete units.
III.Wall panels
About the wall panel,we recommend the cement foam panel.
Advantages of structural steel system for the residential building:
Structural steel framing has long been recognized as a high-strength, dimensionally predictable, rapidly erected framing material. The selection of a structural steel framing system for a multi-story residential project provides significant benefits to the project, including:
- Low floor-to-floor heights and maximized floor-to-ceiling heights using steel framing elements and thin-floor systems
- Flexible spaces thanks to column-free areas-ideal for amenities and a mixture of unit types (link to space utilization page)
- Enhanced framing quality through the use of a long-lasting, durable, high-quality material fabricated off-site to tight tolerances (Quality page link)
- Adaptiveness, as a steel framing system is simpler to expand or remodel (Adaptability page link)
- Reduced foundation loads, column footprint and overall project costs thanks to steel's lightweight properties (Comparison of other material link)
- Earlier building occupancy thanks to quick erection, which reduces overall on-site construction, labor and associated time and costs (link to Schedule page)
Structural steel framing systems are competitive with alternative framing materials -- with the "sweet spot" for buildings five stories and above. Explore the following Multifamily framing concepts to find the best solution for your next project.
rand name
|
KXD Brand steel structure building
|
Model
|
1.Single slope, Double slope, Multi-slope.
|
2.Single span, Double-span, Multi-span, Single floor, Double floors.
|
Column and beam
|
1.Material Q345(S355JR)or Q235(S235JR) steel.
|
2.All bolts connecting.
|
3.Straight cross-section or Variable cross-section.
|
Surface
|
Hot-dip galvanized or painted.
|
Roof and wall panel
|
1.EPS ,PU ,Rockwool sandwich panel.
|
2.Single colorful corrugated steel sheet0.326~0.8mm thick, YX28-205-820(820mm wide).
|
3.Sandwich panel with EPS, ROCK WOOL, PU etc insulation thickness around 50mm~150mm, 950mm or 960mm width.
|
Brace
|
X or V as well as other type bracing made from angle, round pipe etc.
|
Accessories
|
Semi-transparent skylight belts, Ventilators, down pipe, outer gutter etc.
|
Window
|
PVC or Aluminum Alloy.
|
C or Z purlin
|
Size from C120~C320, Z100~Z200.
|
Door
|
Sliding or Rolling up door.
|
Carrying capacity
|
1.Resisting winds and seismic impacts.
|
2.Bearing heavy snows.
|
Drawing
|
1.Making the design and quotation according to your requirements very soon.
|
2.Making the quotation according to your drawings.
|
3.Giving you the satisfying opinion to your project.
|
Certificate
|
ISO9001:2000 , AWS certified welder passport , SGS
|
KXD's H Section Manufacturing Equipment and Process
Steel plate cutting→H section assembly→Automatic welding-H section strengthening→Assembly→Manual welding→Shot blasting-Painting→
Storage
I.Steel plate cutting
The H section steel plate should be checked again by the factory and shall be applied under the condition of up to design and specified requirements after checking. Steel plate cutting should be aimed at quality guarantee and material saving. For each process like plate cutting,H type assembly, components assembly and pre-assembly should be carried out by profession setting-out worker precisely on processing surface and assembly sample plates.To guarantee the accuracy of the components'geometrical dimension,tolerance of form and position, angle and contact surface,inspection is necessary by inspector after setting out.In order to ensure the cutting quality,the surface of the ultra-thick plate is subjected to the surface carburizing hardness test before cutting.The CNC cutting equipment is preferred for cutting.The high purity 98.0% acrylic gas and 99.99% liquid oxygen gas are used to guarantee the smoothness and flatness of the cutting surface without notches and slags.The groove is cut by a special imported cutting machine.
Equipment name: Portable CNC Fire-cutting machine
Model No.: CNCDG-1530
Application feature: steel plate cutting(5-100mm plate cutting thickness), beveling of the edge.Advantageous in small equipment and easy-to-move. Mainly for cutting regular and irregular small components and beveling of the plate.
Equipment name:Straight flame cutting machine
Model No.:DZCG-4000A
Application feature:steel plate cutting(5-100mm plate cutting thickness),Y flange plate, web plate cutting, effective cutting width: 3200mm
Equipment name:CNC cutting machine
Model No.:CNC-4000C
Application feature:steel plate cutting(5-100mm plate cutting thickness),Y flange plate,web plate and irregular component cutting,effective cutting width: 3200mm
Equipment name: Radial drilling machine
Model No.:Z3050*16/1
Application feature:Maximum drilling diameter φ50mm,Mainly for processing of component bolt-connection holes
Equipment name:Puncher machine
Model No.:JH21-400
Application feature:Maximum stamping pressure-400 ton,Mainly for plate punching, blanking, bending and shallow stretching
Equipment name:Shearing machine
Model No.:Q11Y-25*2500
Application feature:cutting width 2500mm and cutting thickness 3-25mm
II.H section steel assembly
The assembly process is set up on the imported H section production line.4 hydraulic positioning system press firmly against between the upper/lower flange and web plates in position. The adjust the parallelism of the flange plates and perpendicularity between flange and web plates and get them fixed after. The fixing welding should adopt C02 gas shielded welding.
Equipment name:H section steel assembly machine
Model No.:Z20B
Application feature:mainly for H type assembly u,flange width 150-800mm,web height 160-2000 mm
III.Automatic welding
The H section steel members will be hoisted into the gantry-type submerged arc automatic welding machine for welding.The welding process should be carried out in accordance with specified welding sequence and regulation parameters.Preheating, which uses the electrical heaters, is necessary for the ultra-thick plates of components.The set temperature shall be determined based on the specified one.Please see factory welding process documents for detail.
Equipment name: Gantry-type submerged arc automatic welding machine
Model No.:LHA5ZB
Application feature:Mainly for assembly welding of H section steel whose maximum cross section up to 800mm×2000mm
IV.H section steel strengthening machine
H section steel strengthening process: Correction of flange flatness by using H section steel flange plate strengthening machine.Flame-correct the perpendicularity between the H section flange and web plate under special circumstances and then correct the side bending of the H section steel. The flame temperature should be controlled under the range of 600~800ºC.
Equipment name:H section steel strengthening machine
Model No.:YTJ60B
Application feature:Mainly for correcting the deformation of I beam or H section steel flange plate during welding process,flange width 200-1000mm, flange thickness≤60mm, web height≥350mm
Equipment name:H section flange strengthening machine
Model No.: HYJ-800
Application feature:Mainly for correcting the deformation of I beam or H section steel flange plate during welding process,flange width 160-800mm,flange thickness≤40mm,web height≥160mm
V.Simulated assembly of component
1.Get familiar with component shop drawing and technical requirements.
2.The model components need to re-check by related department after making and finalizing of the model components and then to assemble.
3.Accurate mark-up
4.Inspect the component after first assembly.For multi-group components, pre-assembly for the first group and then batch assembly after qualified test.
VI.Manual welding
VII.Shot blasting
Equipment name:10-ramming heads shot blasting machine
Model No.:QH1525
Application feature:Mainly for shot blasting of section steels including H section steel, welded members and steel plate,10 ramming head; Machine entry size:1500Í2500 and member at 1200Í2000 size could pass the machine at once; up to Sa2.5 Grade.
VIII.Painting
The surface of the members should be in even,flat, glossy and full painting without manifest of cracking, peeling and pin holing.The color and coating thickness should also meet design requirements.If there is no certain requirements,the following standards should be followed:thickness is 150μm indoor while 125μm outdoor.The allowable deviation is -25μm.The allowable deviation of dry paint film thickness for each-time painting
Two coats of primer:thickness being40±5μm; Two coats of finish paint:thickness being 60±5μm.
Equipment name:Airless sprayer
Model No.:CPQ9CA
Application feature: Derived capacity:56 L/min,Air consumption:50~1200 L/min.Mainly for surface paint of structural members, Pressure ration: 32:1
Process, fabrication and quality control standard on welding groove/beveling of steel structure
1. Purpose
To ensure the welding quality, meeting up the technical requirements of welded members and improve the standardization of our fabrication, we specially formulate this regulation.
2. Application scope
This manual apply for the design, fabricate and inspection of groove joint in terms of manual arc welding, CO2 arch welding, mixed gas arch welding, submerged arc welding and electroslag welding.
3. Design of welding groove
3.1 Key points on design welding groove:
In order to obtain quality groove, it is necessary to choose appropriate form of groove. The option of groove mainly depends on the thickness of base metal, welding method and craftsmanship requirements.The followings are the factors we need to consider:
- minimize the amount of filler metal
- easy for beveling
- in convenience for welding operation and slag removal
- After welding stress and deformation should be as small as possible
3.2 Groove direction:
We will consider the following factors for the groove direction:
A)in favor of welding process and removing slag and leave enough space for welding process on the fusion face
B)minimize the times of flip-flop during welding
C)way of fit-up in actual welding
3.3. Regulation on groove direction of members:
3.3.1 Butt welding on H section rafter/column (when CJP-complete joint penetration and single side fusion is required)
1) When there is no welding backing, the groove orientation on flange plates should be same and falls on the direction in favor of welding on web plats(same rules apply for the PJP situation). Please refer to illustration 1
2)When there is welding backing, we require the groove direction being outward for the flange plates(opposite direction for web plates) and still falls on the direction in favor of welding on web plates. Please refer to illustration 2
3)Butt-welding on construction site:we require all the grooves should be bevelled on the upper rafter/column when it comes to bolt connection for web plates(see illustration 3). For the scenario of welding on web plates, please refer to the illustration 4.
3.3.2 Box column(groove on itself).See illustration 5
4. Welding groove form
4.1. Mark on form and size of welding joint groove:
Example: Shielded metal arch welding, complete joint penetration, butt welding, I shape groove, welding backing and single side weld would be marked MC-BI-BS1
4.2. For the mark of welding method and penetration type, please see the following chart 1.
Chart 1 Mark on welding method and penetration type
Mark |
Welding method |
Penetration type |
MC |
Shielded metal arch welding |
CJP-complete joint penetration |
MP |
PJP-partial joint penetration |
GC |
Shielded arch welding Self-shielded arc welding |
CJP-complete joint penetration |
GP |
PJP-partial joint penetration |
SC |
Submerged arc welding |
CJP-complete joint penetration |
SP |
PJP-partial joint penetration |
SL |
Electroslag welding |
|
4.3. For the mark of single, double side welding and backing material type, please see the following chart 2
Chart 2 Single/double side welding and backing material type mark
Backing material type |
Single/double side welding |
Mark |
Material |
Mark |
Single/double side welding |
BS |
Metal backing |
1 |
Single side welding |
BF |
Other backing |
2 |
Double side welding |
4.4. Mark on each part size of groove, see chart 3.
Chart 3 Size mark on groove
Mark |
Size of each part on groove |
t |
Thickness of welding plate(mm) |
b |
Groove root gap or gap between two members(mm) |
h |
Groove depth(mm) |
p |
Groove roof face(mm) |
α |
Groove angle(º) |
Applicable Codes
LATEST INTERNATIONAL CODES COMPLIANCE
A. (GB50009-2012): Load code for the design of building structures
Loads on all buildings are applied in accordance with:
2012 edition of the Load code for the design of building structures
B. (MOHURD): Ministry of Housing and Urban-Rural Development of the People's Republic of China
Manufacturing and Erection tolerances are applied as per:
GB50205-2001 edition Code for acceptance of construction quality of steel structures
C.(MOHURD): Ministry of Housing and Urban-Rural Development of the People's Republic of ChinaHot rolled sections and built up sections are designed in accordance with:
GB50017-2017 Code for design of steel structure
D. CISA - China Iron & Steel Association - Latest Edition
Cold formed members are designed in accordance with:
GB50018-2002 Technical code of cold-formed thin wall steel structures
E. (MOHURD): Ministry of Housing and Urban-Rural Development of the People's Republic of China
Welding is applied in accordance with:
JGJ81-2002 Technical specification for Welding of steel structure of building
F. Surface treatments are applied in accordance with:
GB/T 8923.1 Preparation of steel substrates before application of paints and related products-Visual assessment of surface cleanliness-Part 1: Rust grades and preparation grade of uncoated steel substrates and of steel substrates after overall removal of previous coatings
STRICT DEFLECTION CRITERIA
Deflection |
Type of structural members |
Deflection Limitation |
Vertical Deflection |
Portal frame rafter |
Only support corrugated steel sheets roof and cold-formed section purlins |
L/180 |
If there is ceiling system |
L/240 |
If there is top running crane |
L/400 |
Mezzanine floor |
Main beam |
L/400 |
Secondary beam |
L/250 |
Purlins |
Only support corrugated steel sheets roof |
L/150 |
If there is ceiling system |
L/240 |
Corrugated roof steel sheet |
L/150 |
Lateral Deflection |
Wall panel |
L/100 |
Wind columns or wind truss structures |
L/250 |
Wall beam |
Only support corrugated steel sheet wall |
L/100 |
Support masonry wall |
L/180 and ≤50mm |
Material Specifications
The material standards for which the building components have been designed as per specifications.
STANDARD MATERIAL SPECIFICATIONS
Material Specifications |
No |
Components |
Specifications |
Minimum yield strength |
Applicable Design Code |
1 |
Built -up (Plates) |
GB/T1591-2008 |
Fy = 34.5 kN/cm2 |
CISA - China Iron & Steel Association - Latest Edition |
2 |
Hot Rolled |
Angles |
GB/T3274-2007 |
Fy = 23.5 kN/cm2 |
CISA - China Iron & Steel Association - Latest Edition |
Beams |
GB/T11263-2010 |
Fy = 23.5 kN/cm2 |
CISA - China Iron & Steel Association - Latest Edition |
3 |
Cold Form
|
Galvanized |
GB/T 2518-2008 |
Fy = 45.0 kN/cm2 |
CISA - China Iron & Steel Association - Latest Edition |
4 |
Roof panel/Wall panel (Zinc) |
GB/T12754-2006 |
Fy = 34.5 kN/cm2 |
CISA - China Iron & Steel Association - Latest Edition |
5 |
Roof panel/Wall panel (Alu) |
GB/T12754-2006 |
Fy = 34.5 kN/cm2 |
CISA - China Iron & Steel Association - Latest Edition |
6 |
X-Bracing |
Galvanized cable bracing |
GB/T 700-2006 |
Fu = 157 kN/cm2 |
CISA - China Iron & Steel Association - Latest Edition |
7 |
Anchor bolts
|
GB/T 700-2006 |
Fu = 40.0 kN/cm2 |
CISA - China Iron & Steel Association - Latest Edition |
8 |
High strength Bolts |
GB/T 1228-2006 |
Ft = 30.3 kN/cm2 Fu = 72 to 83 kN/cm2 |
CISA - China Iron & Steel Association - Latest Edition |
9 |
Machine Bolts
|
GB/T 1228-2006 |
Ft = 13.8 kN/cm2 Fu = 41.0 kN/cm2 |
CISA - China Iron & Steel Association - Latest Edition |