Customization: | Available |
---|---|
Product Name: | Steel Structure |
Brand Name: | Kxd Steel Structure |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Standard: | AISI, ASTM, BS, DIN, GB, JIS | Grade: | Q235B/Q355B Carbon Steel |
Place of Origin: | Shandong, China | Brand Name: | KXD Steel Structure |
Model Number: | Steel Structures | Type: | Light, Light Steel Structure Frame |
Application: | Warehouse/Workshop/Sheds/Office Building | Tolerance: | ±3% |
Processing Service: | Bending, Welding, Decoiling, Cutting, Punching | Product name: | Steel Structure warehouses/workshop/steel building |
Main structure: | Section Column | Purlin: | C/Z Galvanized Steel(Q235) |
Surface treatment: | Painting or Galvanizing | Wall&Roof panel: | Steel Sheet or Sandwich Panel |
Structure type: | Light Portal Frame Structure | Certificate: | ISO9001:2008 |
Life span: | Up to 50 Years | Wind Resistance: | 181km/h |
Supply Ability: 100000 Square Meter/Square Meters per Month steel structure warehouses
Drawings & Quotation
1) Customized design is welcomed.
2) We have an excellent design team. According to the requirements of different projects and clients, we will supply different designs and steel products. In order to give you an exact quotation and drawings, please let us know the following information. We will quote for you promptly.
Basic design requirements of steel structure workshop.
Basic Design Requirements | ||
1.Project location | 5.Length (sidewall,m) | 9.Window quantity, size |
2.Snow load | 6.Width (end wall, m) | 10.Door quantity, size |
3.Wind load | 7.Wall Height (eave, m) | 11.Brickwall needed or not. If yes, 1.2m high or 1.5m high |
4.Seismic magnitude | 8.Middle column allowed or not | 12.Crane needed or not |
13.Thermal insulation. If yes, EPS, fiberglass wool, rock wool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former. |
Engineering Design Software: AutoCAD, PKPM, MTS, 3D3S, Tarch,Tekla Structures(Xsteel)V12.0.etc
Industrial Structural Steel Plant Factory Building Shed Design Price Fabrication Layout Low-Cost Prefab Steel Structure Warehouses.
MAIN PART | ITEM | SPECIFICATION |
Main Steel Frame | Steel Beam | Q235/Q345B |
H shape steel, alkyd/epoxy zinc-rich painting primary painting in twice | ||
Main Column | Q235/Q345B | |
H shape steel, alkyd/epoxy zinc-rich painting primary painting in twice | ||
Wind Column | Q235/Q345B | |
H shape steel, alkyd/epoxy zinc-rich painting primary painting in twice | ||
Supporting System | Brace | Q235/Q345B, angle steel or circular steel tube, process and paited |
Roof Purlin | Q235/Q345B, C or Z shape steel, alkyd painting/hot dip galvanized | |
Wall Purlin | Q235/Q345B, C or Z shape steel, alkyd painting/hot dip galvanized | |
Tie Bar | Q235/Q345B, Φ114x3 round steel tube, process and painted | |
Sag Rod | Q235/Q345B, Φ12 round steel, process and painted | |
Roof Cladding | Color corrugate steel sheet, EPS sandwich panel, rock wool, PU, glass wool | |
Wall Claddding | Color corrugate steel sheet, EPS sandwich panel, rock wool, PU, glass wool | |
Accessories | Bolts | Ordinary, high strength, stud bolts, anchor bolts |
Butter | 0.5mm galvanized/prepainted steel plate, stainless steel | |
Windows | Aluminum alloy-glass, aluminum alloy-shutter, PVC | |
Doors | Sliding sandwich panel/ steel door, rolling shutter door | |
Floor Deck | #600, #688, #720, T:0.7-1.2mm thick color corrugated steel plate | |
Down pipes | VC pipe or steel sheet material or aluminum pipe | |
Roof Ridge | Color steel sheet | |
Edge Cover | 0.5mm color steel sheet | |
Skylighting | FRP light transfer belt | |
Ventilator | Exhaust fan, ventilation louvers | |
Crane | Crane in 5 tons to 20 tons | |
Design Parmameters | Building Size | Length(m)*Width(m)*Eave Height(m) |
Local Weather | Wind load, Snow load, earthquake magnitude | |
Roof and wall panel | With or without insulation for roof and wall | |
Bearing | Make the house resisting heavy wind by 120km/h and 8 grade earthquake | |
Protection | Color steel sandwich panel has a good fire proof and heat insulation performance | |
Packing | Main steel frame loaded in 40'OT, roof and wall panels loaded in 40'HQ |
All the components will be prefabricated in the factory before transported to the construction site. The installation process is quick and easy.
It will significantly shorten the construction period of your buildings, saving a great deal of time and money.
The steel structure has a lightweight but high strength, which is also easy to maintain. It can be utilized for over 50 years.
The prefab steel workshop can be isolated against outdoor environments as well as avoid any leak like water seepage. It also has excellent fire resistance and corrosion resistance.
It is easy to move and relocate steel structure, which can also be recycled without pollution.
The steel structure fabrication workshop is capable of withstanding the attack of strong winds and heavy snow. It also has the excellent seismic performance.
OTHER BUILDING ACCESSORIES
Other building accessories include anchor bolts, fasteners(bolts, nuts, turnbuckle, expansion bolts), gutters, downspouts,doors, windows,ventilators,skylight panels,louvers and all other building-related materials.
Comparison between Pre-Engineered and Conventional Building.
Properties | Pre-Engineered Steel Building | Conventional Building |
Structural Weight | Pre-engineered buildings are on the average 30% lighter because of the efficient use of steel.Secondary members are light weight roll formed "Z" or "C" shaped members. | Primary steel members are selected hot rolled "T" sections. Which are, in many segments of the members heavier than what is actually required by design. Secondary members are selected from standard hot rolled sections which are much heavier. |
Design | Quick and efficient design since PEB's are mainly formed by standard sections and connections design, time is significantly reduced. | Each conventional steel structure is designed from scratch with fewer design aids available to the engineer. |
Construction Period | Average 6 to 8 weeks | Average 20 to 26 weeks |
Foundation | Simple design, easy to construct and light weight. | Extensive, heavy foundation required. |
Erection and Simplicity | Since the connection of compounds is standard the learning curve of erection for each subsequent project is faster. | The connections are normally complicated and differ from project to project resulting tin increasing the time for erection of the buildings. |
Erection Time and Cost | The erection process is faster and much easier with very less requirement for equipment | Typically, conventional steel buildings are 20% more expensive than PEB in most of the cases, the erection costs and time are not estimated accurately. Erection process is slow and extensive field labour is required. Heavy equipment is also needed. |
Seismic Reistance | The low weight flexible frames offer higher resistance to seismic forces. | Rigid heavy frames do not perform well in seismic zones. |
Over all Cost | Price per square meter may be as low as by 30 % than the conventional building. | Higher price per square meter. |
Architecture | Outstanding architectural design can be achieved at low cost using standard architectural details and interfaces. | Special architectural design and features must be developed for each project which often requires research and thus resulting in higher cost. |
Future Expansion | Future expansion is very easy and simple. | Future expansion is most tedious and more costly. |
Safety and Responsibility | Single source of responsibility is there because the entire job is being done by one supplier. | Multiple responsibilities can result in question of who is responsible when the components do not fit in properly, insufficient material is supplied or parts fail to perform particularly at the supplier/contractor interface. |
Performance | All components have been specified and designed specially to act together as a system for maximum efficiency, precise fir and peak performance in the field. | Components are custom designed for a specific application on a specific job. Design and detailing errors are possible when assembling the diverse components into unique buildings. |
Our excellent design team will design the steel structure building for you. We can quote If you give the following information.
1 | Location (where will be built? ) _____country, area |
2 | Size: Length*width*height _____mm*_____mm*_____mm |
3 | Live load on roof(KN/M2), live load on second floor(KN/M2) if have |
4 | Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s |
5 | Snow load (max. Snow height) _____kn/m2, _____mm |
6 | Anti-earthquake _____level |
7 | Brickwall needed or not If yes, 1.2m high or 1.5m high |
8 | Thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels, Corrugated steel sheet with fiber glass wool will be suggested; If not, the Corrugated steel sheet will be ok. The cost of the latter will be much lower than that of the former. |
9 | Door quantity & size _____units, _____(width)mm*_____(height)mm |
10 | Window quanity & size _____units, _____(width)mm*_____(height)mm |
11 | Crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m |
12 | Skylight belt, ventilator and any other accessories if needed. |