China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building

Product Details
Customization: Available
Product Name: Steel Structure
Brand Name: Kxd Steel Structure
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company, Group Corporation
Secured Trading Service
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000
Export Year
2004-03-01
  • China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building
  • China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building
  • China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building
  • China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building
  • China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building
  • China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building
Find Similar Products
  • Overview
  • Product Description
  • FAQ
Overview

Basic Info.

Model NO.
KXD-B1522
Main Beams&Columns
Q345 or Q235 H-Section Steel(Painted or Galvanized
Purlin
C.Z Shape Steel Channel
Size
Costomers′ Requirements
Wall
Sandwich Panel or Corrugated Steel Plate
Door
Client′s Request
Color
Client′s Request
Transport Package
Seaworthy Packing
Specification
customize
Trademark
customize or KXD STEEL
Origin
Shandong China
HS Code
7308000090
Production Capacity
25000 Tons Per Year

Packaging & Delivery

Package Size
1180.00cm * 230.00cm * 260.00cm
Package Gross Weight
25000.000kg

Product Description

China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building

China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar BuildingChina Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar BuildingChina Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building
 
 
Product Description
Items Specification
Main Steel Frame Column Q235, Q345 Welded H Section Steel
Beam Q235, Q345 Welded H Section Steel
Secondary Frame Purlin Q235 C and Z purlin
Knee brace Q235 Angle Steel
Tie Rod Q235 Circular Steel Pipe
Brace Q235 Round Bar
Vertical and Horizontal  Support Q235 Angle Steel, Round Bar or Steel Pipe
Maintenance system Roof Panel EPS Sandwich Panel /  Glass Fiber Sandwich Panel /   Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet
Wall Panel Sandwich Panel / Corrugated Steel Sheet
Accessories Window Aluminiumn Alloy Window / PVC Window / Sandwich Panel Window
Door Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door
Rainspout PVC
Live load on Roof   In 120kg/Sqm (Color steel panel surrounded)
Wind Resistance Grade   12 Grades
Earthquake-resistance   8 Grades
Structure Usage   Up to 20 years
Finishing Options   Vast array of colors and textures available
Paint Options   Alkyd paiting, two primary painting, two finish painting  (gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized.
   
China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar BuildingChina Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building

Products Description
steel structure construction material can be a industrial, agricultural or commercial building for storage or production of goods, often have cranes and forklifts for moving goods around the structures.

It requires easily transported, fast assembled without skilled labor, without affecting the quality and durability. And design allows for strength and sturdiness, protection against earthquakes and wind, and is relatively cheaper when compared to other material building. Warehouse construction material widely applied to warehouse, factory, workshop, storage, garage, hangar, etc., also you can add the partition wall or first floor( second floor) according to multi-purpose.

steel structure construction material adopts Q355B welded H type steel, Q235B steel square tube, Q235B C type steel and Q235B Z type steel to combine or build framework. Roof and wall are color compressing corrugated steel sheet or color steel sandwich panel.
Q345B is one of low carbon alloy steel. Welded H section Q355B steel with high strength, stronger buckling resistance performance, can save 10%-15% material, 30%-40% weight of structure in buildings and 15%-20% weight of structure in bridge than hot-rolled H steel. Compare to hot-rolled H steel, welded H section steel have high-accuracy size performance, can be customized.
MAIN PART ITEM SPECIFICATION
Main Steel Frame Steel Beam Q235/Q345B
H shape steel, alkyd/epoxy zinc-rich painting primary painting in twice
Main Column Q235/Q345B
H shape steel, alkyd/epoxy zinc-rich painting primary painting in twice
Wind Column Q235/Q345B
H shape steel, alkyd/epoxy zinc-rich painting primary painting in twice
Supporting System Brace Q235/Q345B, angle steel or circular steel tube, process and paited
Roof Purlin Q235/Q345B, C or Z shape steel, alkyd painting/hot dip galvanized
Wall Purlin Q235/Q345B, C or Z shape steel, alkyd painting/hot dip galvanized
Tie Bar Q235/Q345B, Φ114x3 round steel tube, process and painted
Sag Rod Q235/Q345B, Φ12 round steel, process and painted
Roof Cladding Color corrugate steel sheet, EPS sandwich panel, rock wool, PU, glass wool
Wall Claddding Color corrugate steel sheet, EPS sandwich panel, rock wool, PU, glass wool
Accessories Bolts Ordinary, high strength, stud bolts, anchor bolts
Butter 0.5mm galvanized/prepainted steel plate, stainless steel
Windows Aluminum alloy-glass, aluminum alloy-shutter, PVC
Doors Sliding sandwich panel/ steel door, rolling shutter door
Floor Deck #600, #688, #720, T:0.7-1.2mm thick color corrugated steel plate
Down pipes VC pipe or steel sheet material or aluminum pipe
Roof Ridge Color steel sheet
Edge Cover 0.5mm color steel sheet
Skylighting FRP light transfer belt
Ventilator Exhaust fan, ventilation louvers
Crane Crane in 5 tons to 20 tons
Design Parmameters Building Size Length(m)*Width(m)*Eave Height(m)
Local Weather Wind load, Snow load, earthquake magnitude
Roof and wall panel With or without insulation for roof and wall
Bearing Make the house resisting heavy wind by 120km/h and 8 grade earthquake
Protection Color steel sandwich panel has a good fire proof and heat insulation performance
Packing Main steel frame loaded in 40'OT, roof and wall panels loaded in 40'HQ


China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar BuildingChina Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building
China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building


China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building

China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building
FAQ

 Comparison between Pre-Engineered and Conventional  Building.

Properties Pre-Engineered Steel Building Conventional   Building
Structural Weight Pre-engineered buildings are on the average 30% lighter because of the efficient use of steel.Secondary members are light weight roll formed "Z" or "C" shaped members. Primary steel members are selected hot rolled "T" sections. Which are, in many segments of the members heavier than what is actually required by design. Secondary members are selected from standard hot rolled sections which are much heavier.
Design Quick and efficient design since PEB's are mainly formed by standard sections and connections design, time is significantly reduced. Each conventional steel structure is designed from scratch with fewer design aids available to the engineer.
Construction Period Average 6 to 8 weeks Average 20 to 26 weeks
Foundation Simple design, easy to construct and light weight. Extensive, heavy foundation required.
Erection and Simplicity Since the connection of compounds is standard the learning curve of erection for each subsequent project is faster. The connections are normally complicated and differ from project to project resulting tin increasing the time for erection of the buildings.
Erection Time and Cost The erection process is faster and much easier with very less requirement for equipment Typically, conventional steel buildings are 20% more expensive than PEB in most of the cases, the erection costs and time are not estimated accurately.
Erection process is slow and extensive field labour is required. Heavy equipment is also needed.
Seismic Reistance The low weight flexible frames offer higher resistance to seismic forces. Rigid heavy frames do not perform well in seismic zones.
Over all Cost Price per square meter may be as low as by 30 % than the conventional building. Higher price per square meter.
Architecture Outstanding architectural design can be achieved at low cost using standard architectural details and interfaces. Special architectural design and features must be developed for each project which often requires research and thus resulting in higher cost.
Future Expansion Future expansion is very easy and simple. Future expansion is most tedious and more costly.
Safety and Responsibility Single source of responsibility is there because the entire job is being done by one supplier. Multiple responsibilities can result in question of who is responsible when the components do not fit in properly, insufficient material is supplied or parts fail to perform particularly at the supplier/contractor interface.
Performance All components have been specified and designed specially to act together as a system for maximum efficiency, precise fir and peak performance in the field. Components are custom designed for a specific application on a specific job. Design and detailing errors are possible when assembling the diverse components into unique buildings.


Our excellent design team will design the steel structure building for you. We can quote If you give the following information.
 

1 Location (where will be built? ) _____country, area
2 Size: Length*width*height _____mm*_____mm*_____mm
3 Live load on roof(KN/M2), live load on second floor(KN/M2) if have
4 Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
5 Snow load (max. Snow height) _____kn/m2, _____mm
6 Anti-earthquake _____level
7 Brickwall needed or not If yes, 1.2m high or 1.5m high
8 Thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels, Corrugated steel sheet with fiber glass wool will be suggested; If not, the Corrugated steel sheet will be ok. The cost of the latter will be much lower than that of the former.
9 Door quantity & size _____units, _____(width)mm*_____(height)mm
10 Window quanity & size _____units, _____(width)mm*_____(height)mm
11 Crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m
12 Skylight belt, ventilator and any other accessories if needed.
China Prefabricated Steel Structure Buildings Steel Construction Warehouse Building Hangar Building
Q:Are you manufacturer or trading company?
A:We are manufacture factory, located in Qingdao city, near to Qingdao port. And we have total 7 workshops from steel structure to wall and roof sheet.
 
Q: How about your production capacity?
A: Pre engineered steel structure building (warehouse/workshop/hangar/shed/high rise apartment): 50000 sqm monthly. Prefabricated house (portacabin/labor camp/site office): 100000 sqm monthly. Prefab affordable house (low cost family/residential/refugee): 4200 units monthly. Container house: 800 units monthly. Light steel villa: 10000 sqm monthly.

Q: How about your quality control?
A: We have got certificate ISO & CE. Products processing through cutting, bending, welding, shot blasting, ultrasonic testing, packing, storing, loading to ensure no quality defects.

Q: Is third party inspection available?
A: SGS, BV, TUV, etc. are available, it is according to client requirement.

Q: How about your delivery time?
A: Generally within 20~30 days, it is according to order quantity, partial shipment is allowed for big order.

Q: What about the installation?
A: We'll provide the detailed installation drawing, supervisors guiding installation is available. We can do turnkey job for some kind of projects.

Q: How to ensure the product you supply is what we want exactly?
A: Sales and engineer team will provide you the suitable solution according to your requirements before placing order. Proposal drawing, Shop drawing, 3D drawing, Materials photos, Finished projects photos are available, which will help you understand the solution we provided deeply.

Kindly contact Ferchichi if any item interests you , I'll stay online all the time, thank you.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier