• Low Income Temporary Prefabricated Steel House
  • Low Income Temporary Prefabricated Steel House
  • Low Income Temporary Prefabricated Steel House
  • Low Income Temporary Prefabricated Steel House
  • Low Income Temporary Prefabricated Steel House
  • Low Income Temporary Prefabricated Steel House

Low Income Temporary Prefabricated Steel House

Warranty: 30-Year Limted Warranty
Material: Steel Structure
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop
Certification: ISO, SGS
Customized: Customized
Size: as Customers′ Requirement
Customization:
Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company, Group Corporation

Basic Info.

Model NO.
KXD-PH1543
Color Reference
Ral
Member of Engineering Team
20
Quality Control
Daily
Life Cycle
50 Years
Construction Period
60 Days
Customer Service
Aftersale Service
Project Management
Turnkey Solution
Engineering Tools
CAD
Transport Package
Seaworthy Package for Steel Structure Workshop
Specification
SGS / ISO
Trademark
KXD
Origin
China
HS Code
9406000090
Production Capacity
2000ton/Month

Product Description

Light steel structure prefabricated house for Workers Dormitory

I.Quick Build Prefabricated/PrefabHouse is a kind of environmental friendly, economical mobile house that used sandwich panels as wallboard, combined by standard module, and the structural steel members connected by bolts.
Prefab house is widely using in different industry: the temporary accommodation house for road, railway and building construction site, etc.Also can be as temporary office, meeting room , headquarters , public accommodation , and temporary store , school,  hospital , parking lots, show rooms, electric control house , gas station etc. 

II.Advantages of Prefabricated/Prefab House
1. Convenient to assemble and disassemble, can be used repeatedly.
2. Practical, good space utilization and high price performance.
3. Almost dry construction which is environmental friendly.
4. Light and reliable, the steel structure is strong and firm.
5. Long life span capacity which could be above 15 years.
6.Waterproof, fireproof, heatproof, windproof, soundproof 

It just need simple tools to assemble. Each worker can assemble 20~30 square meters every day. 6 worker can finish 300sqm prefab house in 2 days.

Beautiful decoration: The prefab house is beautiful and grace, have bright and bland color, flat and neat board, with good decoration effect.

III.Material List of Standard Prefab K House (1Floor)
No. Component Specification Material thickness Remark
I Main steel structure
1 Column Double 8#C steel   Blue 
2 Ground beam 8#C steel   black
3 A shape beam 80#C steel + 50x30   flat pipe   Iron red
4 Roof purlin T steel    
5 Ring beam 8#C steel   Blue 
6 Canopy frame 8#C steel   Blue 
7 Walkway frame support 8#C steel   Blue 
8 Lateral bracing angle steel   Blue 
II Wall
1 External wall panel EPS sandwich   panel or rock wood panel 50mm,75mm for your options Grey white+ivory white
2 Inner partition panel EPS sandwich   panel or rock wood panel 50mm,75mm for your options  Grey white
III Roofing
1 Roof panel EPS sandwich  panel or rock wood panel 50mm,75mm for your options Blue, red,ivory white,grey white
IV Door & window
1 Door EPS sandwich   panel or rock wood panel door or steel door 880X2040mm White
2 Window Aluminum  sliding  window Width1740×height 925mm
 

IV.Our Services

If You Need: prefabricated kit house; prefab kit house.steel structure homes.steel frame house

Only Need You To Provide Us:house area,how many floor and bedrooms,luxury or normally,or low cost configuation.

We Can Provide You:villa;bungalw;low cost house;granny flat;apartment etc.many style house turnkey solution from concept-design+cost estimation+detail+fabrication+supply/manufacture+Installation

V.Packaging & Shipping

prefabricated House's packing:well packed export quality package ,shipped by 40hq. 

VI.KXD's Prefab House Design Package
KXD'S 10-20 engineering team enables us one of distinguished quality that we could design and engineer modularized prefabricated house which shortens our potential buyers decision-making time and finalize the deal in the possbily quickest time

VII.Company Information
Qingdao KXD Steel Structure Co., Ltd. with registered capital of RMB 100 million, we are professionally engaged in steel structure design, manufacture and installation. We have exported to more than 30 countries, with more than 200, 000 tons.
Our strength & brief as below:
1. Founded in 2004, with 300, 000 SQM production area.
2. Products Scope:
Steel Structure for industrial and power fields, such as power plant, steel mill, solar industry, hydroelectric plant, petrochemical fields, oil and gas pipeline, etc.
Steel Structure for civil fields, like high-rise building, heavy/light steel structure, workshop& warehouse, etc.
Steel structure for poultry house: chicken house and  pig house.etc.
Prefabricated house and container house
EPS/ Glass wool /Rock wool sandwich panels
Mechanical components
3. China national high-tech company, with 120 engineers and 1260 staff in total.
4. Service cover design, manufacture and installation.
5. The strength of parent firm (Canada listed company with total asset 4 billion, 3600 employees).
6. Biggest steel structure manufacturer in northern China, with annual output 200, 000 tons.
7. Got national steel structure 1st grade qualification on production, construction and contract.
8. Got the China National Construction Steel Structure Gold Award for several project, which is the highest award in this felds.
9. Got ISO9000, ISO14000, ISO18000, China national well-known brand.
10. Exported to more than 30 countries, with more than 200, 000 tons.
Low Income Temporary Prefabricated Steel House
 KXD's H Section Manufacturing Equipment and Process
Steel plate cutting→H section assembly→Automatic welding-H section strengthening→Assembly→Manual welding→Shot blasting-Painting→
Storage

I.Steel plate cutting
The H section  steel plate should be checked again by the factory and shall be applied under the condition of up to design and specified requirements after checking. Steel plate cutting should be aimed at quality guarantee and material saving. For each process like plate cutting,H type assembly, components assembly and pre-assembly should be carried out by profession setting-out worker precisely on processing surface and assembly sample plates.To guarantee the accuracy of the components'geometrical dimension,tolerance of form and position, angle and contact surface,inspection is necessary by inspector after setting out.In order to ensure the cutting quality,the surface of the ultra-thick plate is subjected to the surface carburizing hardness test before cutting.The CNC cutting equipment is preferred for cutting.The high purity 98.0% acrylic gas and 99.99% liquid oxygen gas are used to guarantee the smoothness and flatness of the cutting surface without notches and slags.The groove is cut by a special imported cutting machine.


Equipment name: Portable CNC Fire-cutting machine
Model No.: CNCDG-1530
Application feature: steel plate cutting(5-100mm plate cutting thickness), beveling of the edge.Advantageous in small equipment and easy-to-move. Mainly for cutting regular and irregular small components and beveling of the plate.

Equipment name:Straight flame cutting machine

Model No.:DZCG-4000A
Application feature:steel plate cutting(5-100mm plate cutting thickness),Y flange plate, web plate cutting, effective cutting width: 3200mm


Equipment name:CNC cutting machine
Model No.:CNC-4000C
Application feature:steel plate cutting(5-100mm plate cutting thickness),Y flange plate,web plate and irregular component cutting,effective cutting width: 3200mm

Equipment name: Radial drilling machine
Model No.:Z3050*16/1 
Application feature:Maximum drilling diameter φ50mm,Mainly for processing of component bolt-connection holes


Equipment name:Puncher machine
Model No.:JH21-400
Application feature:Maximum stamping pressure-400 ton,Mainly for plate punching, blanking, bending and shallow stretching


Equipment name:Shearing machine 
Model No.:Q11Y-25*2500 
Application feature:cutting width 2500mm and cutting thickness 3-25mm


II.H section steel assembly
The assembly process is set up on the imported H section production line.4 hydraulic positioning system press firmly against between the upper/lower flange and web plates in position. The adjust the parallelism of the flange plates and perpendicularity between flange and web plates and get them fixed after. The fixing welding should adopt C02 gas shielded welding.

Equipment name:H section steel assembly machine

Model No.:Z20B
Application feature:mainly for H type assembly u,flange width 150-800mm,web height 160-2000 mm

III.Automatic welding

The H section steel members will be hoisted into the gantry-type submerged arc automatic welding machine for welding.The welding process should be carried out in accordance with specified welding sequence and regulation parameters.Preheating, which uses the electrical heaters, is necessary for the ultra-thick plates of components.The set temperature shall be determined based on the specified one.Please see factory welding process documents for detail.


Equipment name: Gantry-type submerged arc automatic welding machine  
Model No.:LHA5ZB
Application feature:Mainly for assembly welding of H section steel whose maximum cross section up to 800mm×2000mm

IV.H section steel strengthening machine
H section steel strengthening process: Correction of flange flatness by using H section steel flange plate strengthening machine.Flame-correct the perpendicularity between the H section flange and web plate under special circumstances and then correct the side bending of the H section steel. The flame temperature should be controlled under the range of 600~800ºC.


Equipment name:H section steel strengthening machine  
Model No.:YTJ60B
Application feature:Mainly for correcting the deformation of I beam or H section steel flange plate during welding process,flange width 200-1000mm, flange thickness≤60mm, web height≥350mm


Equipment name:H section flange strengthening machine
Model No.: HYJ-800
Application feature:Mainly for correcting the deformation of I beam or H section steel flange plate during welding process,flange width 160-800mm,flange thickness≤40mm,web height≥160mm

V.Simulated assembly of component
1.Get familiar with component shop drawing and technical requirements.
2.The model components need to re-check by related department after making and finalizing of the model components and then to assemble.
3.Accurate mark-up
4.Inspect the component after first assembly.For multi-group components, pre-assembly for the first group and then batch assembly after qualified test.


VI.Manual welding

VII.Shot blasting

Equipment name:10-ramming heads shot blasting machine

Model No.:QH1525    
Application feature:Mainly for shot blasting of section steels including H section steel, welded members and steel plate,10 ramming head; Machine entry size:1500Í2500 and member at 1200Í2000 size could pass the machine at once; up to Sa2.5 Grade.


VIII.Painting
The surface of the members should be in even,flat, glossy and full painting without manifest of cracking, peeling and pin holing.The color and coating thickness should also meet design requirements.If there is no certain requirements,the following standards should be followed:thickness is 150μm indoor while 125μm outdoor.The allowable deviation is -25μm.The allowable deviation of dry paint film thickness for each-time painting
Two coats of primer:thickness being40±5μm; Two coats of finish paint:thickness being 60±5μm.


Equipment name:Airless sprayer     
Model No.:CPQ9CA
Application feature: Derived capacity:56 L/min,Air consumption:50~1200 L/min.Mainly for surface paint of structural members, Pressure ration: 32:1
Process, fabrication and quality control standard on welding groove/beveling of steel structure
1. Purpose
To ensure the welding quality, meeting up the technical requirements of welded members and improve the standardization of our fabrication, we specially formulate this regulation.
2. Application scope
This manual apply for the design, fabricate and inspection of groove joint in terms of manual arc welding, CO2 arch welding, mixed gas arch welding, submerged arc welding and electroslag welding.
3. Design of welding groove
3.1 Key points on design welding groove:
In order to obtain quality groove, it is necessary to choose appropriate form of groove. The option of groove mainly depends on the thickness of base metal, welding method and craftsmanship requirements.The followings are the factors we need to consider:
  1. minimize the amount of filler metal
  2. easy for beveling
  3. in convenience for welding operation and slag removal
  4. After welding stress and deformation should be as small as possible

3.2 Groove direction:
We will consider the following factors for the groove direction:
A)in favor of welding process and removing slag and leave enough space for welding process on the fusion face
B)minimize the times of flip-flop during welding
C)way of fit-up in actual welding

3.3. Regulation on groove direction of members:

3.3.1 Butt welding on H section rafter/column (when CJP-complete joint penetration and single side fusion is required)
1) When there is no welding backing, the groove orientation on flange plates should be same and falls on the direction in favor of welding on web plats(same rules apply for the PJP situation). Please refer to illustration 1
Low Income Temporary Prefabricated Steel House
2)When there is welding backing, we require the groove direction being outward for the flange plates(opposite direction for web plates) and still falls on the direction in favor of welding on web plates. Please refer to illustration 2
Low Income Temporary Prefabricated Steel House3)Butt-welding on construction site:we require all the grooves should be bevelled on the upper rafter/column when it comes to bolt connection for web plates(see illustration 3). For the scenario of welding on web plates, please refer to the illustration 4.
Low Income Temporary Prefabricated Steel HouseLow Income Temporary Prefabricated Steel House3.3.2 Box column(groove on itself).See illustration 5

Low Income Temporary Prefabricated Steel House4. Welding groove form
4.1. Mark on form and size of welding joint groove:
Low Income Temporary Prefabricated Steel HouseExample: Shielded metal arch welding, complete joint penetration, butt welding, I shape groove, welding backing and single side weld would be marked MC-BI-BS1
4.2. For the mark of welding method and penetration type, please see the following chart 1.
Chart 1 Mark on welding method and penetration type
Mark Welding method Penetration type
MC Shielded metal arch welding CJP-complete joint penetration
MP PJP-partial joint penetration
GC Shielded arch welding
Self-shielded arc welding
CJP-complete joint penetration
GP PJP-partial joint penetration
SC Submerged arc welding CJP-complete joint penetration
SP PJP-partial joint penetration
SL Electroslag welding  
 4.3. For the mark of single, double side welding and backing material type, please see the following chart 2
Chart 2 Single/double side welding and backing material type mark
Backing material type Single/double side welding
Mark Material Mark Single/double side welding
BS Metal backing 1 Single side welding
BF Other backing 2 Double side welding
4.4. Mark on each part size of groove, see chart 3.
Chart 3 Size mark on groove
Mark Size of each part on groove
t Thickness of welding plate(mm)
b Groove root gap or gap between two members(mm)
h Groove depth(mm)
p Groove roof face(mm)
α Groove angle(º)

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now