Customization: | Available |
---|---|
After-sales Service: | Over 30 Year Limited Warranty |
Layers: | Single-Layer |
Still deciding? Get samples of US$ 200/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Steel is the most important building material in the world because of its light weight and high strength. Steel has the highest strength-to-weight ratio of all building materials, meaning that its members add strength without adding stress to the building frame.
This advantage gives our engineers team more flexibility when designing structure. The steel church building be easily modified the layout and designed clear span to meet lager space requirement. Another major benefit of steel church building is its lower cost and less waste compared to traditional building materials. More larger the building is, more cost will be saved. Not only the steel price is lower, but also the groundwork will be smaller. Also, As an environmentally friendly material, steel almost no waste and can reduce energy costs and save you a lot of money over time.
H steel Character | |
Usage | H column & H beam |
Classification | Wide flange H beam (HW) Flange H beam (HM) Narrow flange H beam (HN) |
Product Technique | Hot rolled, cold-bend, welded |
Our production ability | 5000 Ton/Month |
Material Grade | Q235B, Q355, Q355B |
Size | Height:(H): 100-900mm Width(B): 100-408mm Thickness(T1): 6-21mm Thickness(T2): 8-35mm Length: 6meters-12meters |
Application | Widely used as prefab building steel structure frame, such as frame of workshop, warehouse, factory, office building, shopping mall, high rise building, farm building, bridge, machine platform, etc. |
Advantage | High strength, Light weight, Cycle use, Easy transport, Quick install,Low price |
Factories |
Warehouse/Workshop |
High rise building |
Plant |
Storage/Shed/Carport |
Sports Stadium |
Shopping mall |
Poultry house |
Office building |
Component | Specification | |
Main Steel Frame | Column | Q235, Q355 (Hot Rollled / Welded H Section Steel) |
Beam | Q235, Q355 (Hot Rollled / Welded H Section Steel) | |
Secondary Frame | Purlin | Q235, Q355 C and Z purlin |
Knee brace | Q235 Angle Steel | |
Tie Rod | Q235 Circular Steel Pipe | |
Brace | Q235 Round Bar | |
Vertical and Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | |
Maintenance system | Roof Panel | Steel Sheet Insulated Sandwich Panel (EPS /Glass-Fiber / Rock-Wool / Pu) |
Wall Panel | Steel Sheet Insulated Sandwich Panel (EPS /Glass-Fiber / Rock-Wool / Pu) Decorative Panel (Glass Curtain, Aluminmum Panel |
|
Accessories | Window | Plastic steel / Aluminium Alloy / PVC Window |
Door | Sliding Door / Electric Rolling Up Shutte / Metal Door / Personal Door | |
Rain-spout | PVC | |
Live load on Roof | In 120kg/Sqm (Color steel panel surrounded) | |
Wind Resistance Grade | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure Usage | Up to 50 years | |
Temperature | Suitable temperature.-50°C~+50°C | |
Certification | CE, SGS,ISO9001:2008,ISO14001:2004 | |
Finishing Options | Vast array of colors and textures available | |
Paint Options | Alkyd painting / Epoxy painting / Hot Dipping Galvanized |
The packing method for main steel frame use steel pallet, This method packing can better protect the steel frame, and alos the loading and unloading will be fast and convenient since it could be taken as a whole.(see attached photo). The best advantage can save the quantity of shipping contaier, so it will save the cost of ocean freight, save unlading time and cost.
Upon customer request, we could send our engineer to guide the installation, or a small team to install at the same time, teaching local workers to install, or enough workers to install all the goods by ourselves. It depends on whether the cost is economic.