Prefab Modular Container Home for Camp Site Flat Pack Steel Container House

Product Details
Customization: Available
Grade: Q235B
Size: According to Customers′ Requirement
Manufacturer/Factory, Trading Company, Group Corporation
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000
Export Year
2004-03-01
  • Prefab Modular Container Home for Camp Site Flat Pack Steel Container House
  • Prefab Modular Container Home for Camp Site Flat Pack Steel Container House
  • Prefab Modular Container Home for Camp Site Flat Pack Steel Container House
  • Prefab Modular Container Home for Camp Site Flat Pack Steel Container House
  • Prefab Modular Container Home for Camp Site Flat Pack Steel Container House
  • Prefab Modular Container Home for Camp Site Flat Pack Steel Container House
Find Similar Products

Basic Info.

Model NO.
KXD-SSW1626
MOQ
200m2
Main Structure
H Section Welded Steel Structure
Roof & Wall Material
Color Steel Sheet/Sandwich Panel
Window
Aluminium Alloy
Door
Sliding or Roll up
Connect
Bolt
Delivery Port
Qingdao Port
Transport Package
Seaworthy Package for Steel Structure Workshop
Specification
ISO, SGS, BV
Trademark
KXD
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
2000ton/Month

Product Description

Modular Container Home for Camp Site
:
Prefab Modular Container Home for Camp Site Flat Pack Steel Container HousePrefab Modular Container Home for Camp Site Flat Pack Steel Container HousePrefab Modular Container Home for Camp Site Flat Pack Steel Container House
Modular Structural Steel Workshop
Materials Cost
Construction and material costs for traditional structures are much more expensive than a prefabricated steel or metal buildings, and as a result, our products are more cost effective.

Quick Assembly
Pre-fabricated steel structures arrive at the construction site in ready-to-assemble sections. All you have to do is lay it out and bolt it together. As most kits arrive with all components included, they are simple to assemble and provide massive savings on labor and material costs.

Accurate Design
Metal and steel building templates are engineered, generated, and manufactured using computer technology. Measurements, fittings and all components are engineered and created with laser precision. With such accurate design, contractors can make more accurate project estimates and it virtually eliminates the extra cost of excessive materials and other unexpected expenses in the building process.

Highly Energy Efficient
Steel buildings are highly efficient by design. Using top-of-the-line insulation and construction materials, they are often the most energy efficient buildings on the market. Steel buildings are not affected by intense sunlight or extreme cold weather as steel doesn't warp in extreme weather the way wood and mortar buildings have a tendency to do, which leads to long-term energy efficiency.
Prefab Modular Container Home for Camp Site Flat Pack Steel Container HousePrefab Modular Container Home for Camp Site Flat Pack Steel Container House
Increased Safety
Designed to be strong and structurally sound, pre-engineered steel buildings can withstand severe weather conditions and reduce the risk of fire damage. This allows you to reap the long-term benefits of as the building will not succumb to natural weather patterns and provide more longevity to your investment. Increased safety can also lead to increased savings as many insurance companies offer discounts of around 40% to owners.

Improved Flexibility, Design and Portability
Prefab steel buildings are expandable and manufacturers are also very flexible and accommodating to design and engineer custom plans for your project, offering you more freedom in the design and layout of your building. In addition, you can simply add another section to the steel building if you need more space or disassemble the it and move it with you if you need to be in another location.

Prefab Modular Container Home for Camp Site Flat Pack Steel Container House
 
Name
 
  Specification
 
Length
 
Single slope, double slope, muti slope
 
Width
 
Single span, double-span, Multi-span
 
Height
 
single floor, double floors
 
Column
 
Q235, Q345 welding H section steel
 
Beam
 
Q235, Q345 welding H section steel
 
Purlin
 
Q235 C channel or Z channel
 
Knee brace
 
Q235 angle steel
 
Vertical and transversal support
 
Q235 angle steel, round bar or steel pipe
 
Tie ba r
 
Q235 steel pipe
 
Brace
 
Q235 round bar
 
Sleeve
 
Q235 steel pipe
 
Cladding system
 
sandwich panels (EPS, PU, Fiber glass wool etc.) or can use corrugated steel sheet 
with fiber glass wool insulation and steel wire gauze.
 
Pa r tition wall
 
sandwich panels (EPS, PU, Fiber glass wool etc.)
 
Second floor
 
floor deck
 
Second floor office
 
fiber cement board floor panel or checkered steel plate
 
Stair:
 
Q235 steel structure with checkered steel plate
 
Ventilation:
 
ventilator
 
Door
 
sandwich panel sliding door or roller door
 
Windows
 
PVC or Aluminum
 
Water
 
Provided plan, design and technical service.
 
Electricity
 
Provided plan, design and technical service.
 
Gutter
 
stainless steel or color steel sheet
 
Rainspout:
 
PVC
 
Live load on roof
 
In 120kg/Sqm (Color steel panel surrounded)
 
Wind resistance grade
 
12
 
Earthquake-resistance
 
8 degree
 
 
KXD's H Section Manufacturing Equipment and Process
Steel plate cutting→H section assembly→Automatic welding-H section strengthening→Assembly→Manual welding→Shot blasting-Painting→
Storage

I.Steel plate cutting
The H section  steel plate should be checked again by the factory and shall be applied under the condition of up to design and specified requirements after checking. Steel plate cutting should be aimed at quality guarantee and material saving. For each process like plate cutting,H type assembly, components assembly and pre-assembly should be carried out by profession setting-out worker precisely on processing surface and assembly sample plates.To guarantee the accuracy of the components'geometrical dimension,tolerance of form and position, angle and contact surface,inspection is necessary by inspector after setting out.In order to ensure the cutting quality,the surface of the ultra-thick plate is subjected to the surface carburizing hardness test before cutting.The CNC cutting equipment is preferred for cutting.The high purity 98.0% acrylic gas and 99.99% liquid oxygen gas are used to guarantee the smoothness and flatness of the cutting surface without notches and slags.The groove is cut by a special imported cutting machine.


Equipment name: Portable CNC Fire-cutting machine
Model No.: CNCDG-1530
Application feature: steel plate cutting(5-100mm plate cutting thickness), beveling of the edge.Advantageous in small equipment and easy-to-move. Mainly for cutting regular and irregular small components and beveling of the plate.

Equipment name:Straight flame cutting machine

Model No.:DZCG-4000A
Application feature:steel plate cutting(5-100mm plate cutting thickness),Y flange plate, web plate cutting, effective cutting width: 3200mm


Equipment name:CNC cutting machine
Model No.:CNC-4000C
Application feature:steel plate cutting(5-100mm plate cutting thickness),Y flange plate,web plate and irregular component cutting,effective cutting width: 3200mm

Equipment name: Radial drilling machine
Model No.:Z3050*16/1 
Application feature:Maximum drilling diameter φ50mm,Mainly for processing of component bolt-connection holes


Equipment name:Puncher machine
Model No.:JH21-400
Application feature:Maximum stamping pressure-400 ton,Mainly for plate punching, blanking, bending and shallow stretching


Equipment name:Shearing machine 
Model No.:Q11Y-25*2500 
Application feature:cutting width 2500mm and cutting thickness 3-25mm


II.H section steel assembly
The assembly process is set up on the imported H section production line.4 hydraulic positioning system press firmly against between the upper/lower flange and web plates in position. The adjust the parallelism of the flange plates and perpendicularity between flange and web plates and get them fixed after. The fixing welding should adopt C02 gas shielded welding.

Equipment name:H section steel assembly machine

Model No.:Z20B
Application feature:mainly for H type assembly u,flange width 150-800mm,web height 160-2000 mm

III.Automatic welding

The H section steel members will be hoisted into the gantry-type submerged arc automatic welding machine for welding.The welding process should be carried out in accordance with specified welding sequence and regulation parameters.Preheating, which uses the electrical heaters, is necessary for the ultra-thick plates of components.The set temperature shall be determined based on the specified one.Please see factory welding process documents for detail.


Equipment name: Gantry-type submerged arc automatic welding machine  
Model No.:LHA5ZB
Application feature:Mainly for assembly welding of H section steel whose maximum cross section up to 800mm×2000mm

IV.H section steel strengthening machine
H section steel strengthening process: Correction of flange flatness by using H section steel flange plate strengthening machine.Flame-correct the perpendicularity between the H section flange and web plate under special circumstances and then correct the side bending of the H section steel. The flame temperature should be controlled under the range of 600~800ºC.


Equipment name:H section steel strengthening machine  
Model No.:YTJ60B
Application feature:Mainly for correcting the deformation of I beam or H section steel flange plate during welding process,flange width 200-1000mm, flange thickness≤60mm, web height≥350mm


Equipment name:H section flange strengthening machine
Model No.: HYJ-800
Application feature:Mainly for correcting the deformation of I beam or H section steel flange plate during welding process,flange width 160-800mm,flange thickness≤40mm,web height≥160mm

V.Simulated assembly of component
1.Get familiar with component shop drawing and technical requirements.
2.The model components need to re-check by related department after making and finalizing of the model components and then to assemble.
3.Accurate mark-up
4.Inspect the component after first assembly.For multi-group components, pre-assembly for the first group and then batch assembly after qualified test.


VI.Manual welding

VII.Shot blasting

Equipment name:10-ramming heads shot blasting machine

Model No.:QH1525    
Application feature:Mainly for shot blasting of section steels including H section steel, welded members and steel plate,10 ramming head; Machine entry size:1500Í2500 and member at 1200Í2000 size could pass the machine at once; up to Sa2.5 Grade.


VIII.Painting
The surface of the members should be in even,flat, glossy and full painting without manifest of cracking, peeling and pin holing.The color and coating thickness should also meet design requirements.If there is no certain requirements,the following standards should be followed:thickness is 150μm indoor while 125μm outdoor.The allowable deviation is -25μm.The allowable deviation of dry paint film thickness for each-time painting
Two coats of primer:thickness being40±5μm; Two coats of finish paint:thickness being 60±5μm.


Equipment name:Airless sprayer     
Model No.:CPQ9CA
Application feature: Derived capacity:56 L/min,Air consumption:50~1200 L/min.Mainly for surface paint of structural members, Pressure ration: 32:1

 
Process, fabrication and quality control standard on welding groove/beveling of steel structure
1. Purpose
To ensure the welding quality, meeting up the technical requirements of welded members and improve the standardization of our fabrication, we specially formulate this regulation.
2. Application scope
This manual apply for the design, fabricate and inspection of groove joint in terms of manual arc welding, CO2 arch welding, mixed gas arch welding, submerged arc welding and electroslag welding.
3. Design of welding groove
3.1 Key points on design welding groove:
In order to obtain quality groove, it is necessary to choose appropriate form of groove. The option of groove mainly depends on the thickness of base metal, welding method and craftsmanship requirements.The followings are the factors we need to consider:
  1. minimize the amount of filler metal
  2. easy for beveling
  3. in convenience for welding operation and slag removal
  4. After welding stress and deformation should be as small as possible

3.2 Groove direction:
We will consider the following factors for the groove direction:
A)in favor of welding process and removing slag and leave enough space for welding process on the fusion face
B)minimize the times of flip-flop during welding
C)way of fit-up in actual welding

3.3. Regulation on groove direction of members:

3.3.1 Butt welding on H section rafter/column (when CJP-complete joint penetration and single side fusion is required)
1) When there is no welding backing, the groove orientation on flange plates should be same and falls on the direction in favor of welding on web plats(same rules apply for the PJP situation). Please refer to illustration 1
Prefab Modular Container Home for Camp Site Flat Pack Steel Container House
2)When there is welding backing, we require the groove direction being outward for the flange plates(opposite direction for web plates) and still falls on the direction in favor of welding on web plates. Please refer to illustration 2
Prefab Modular Container Home for Camp Site Flat Pack Steel Container House3)Butt-welding on construction site:we require all the grooves should be bevelled on the upper rafter/column when it comes to bolt connection for web plates(see illustration 3). For the scenario of welding on web plates, please refer to the illustration 4.
Prefab Modular Container Home for Camp Site Flat Pack Steel Container HousePrefab Modular Container Home for Camp Site Flat Pack Steel Container House3.3.2 Box column(groove on itself).See illustration 5

Prefab Modular Container Home for Camp Site Flat Pack Steel Container House4. Welding groove form
4.1. Mark on form and size of welding joint groove:
Prefab Modular Container Home for Camp Site Flat Pack Steel Container HouseExample: Shielded metal arch welding, complete joint penetration, butt welding, I shape groove, welding backing and single side weld would be marked MC-BI-BS1
4.2. For the mark of welding method and penetration type, please see the following chart 1.
Chart 1 Mark on welding method and penetration type
Mark Welding method Penetration type
MC Shielded metal arch welding CJP-complete joint penetration
MP PJP-partial joint penetration
GC Shielded arch welding
Self-shielded arc welding
CJP-complete joint penetration
GP PJP-partial joint penetration
SC Submerged arc welding CJP-complete joint penetration
SP PJP-partial joint penetration
SL Electroslag welding  
 4.3. For the mark of single, double side welding and backing material type, please see the following chart 2
Chart 2 Single/double side welding and backing material type mark
Backing material type Single/double side welding
Mark Material Mark Single/double side welding
BS Metal backing 1 Single side welding
BF Other backing 2 Double side welding
4.4. Mark on each part size of groove, see chart 3.
Chart 3 Size mark on groove
Mark Size of each part on groove
t Thickness of welding plate(mm)
b Groove root gap or gap between two members(mm)
h Groove depth(mm)
p Groove roof face(mm)
α Groove angle(º)

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier