Product Description
Industrial Prefab Steel Structure Mine Gold Workshop
The total steel structure industrial building project cost is $5.38 million USD,the steel is about 2600ton,the whole contract period of 150 days,80 days,on-site installation and construction of 80 days.It is used as gold mining plant.


Steel column:latticed column,with the height of the latticed column up to 39 meters,fixing the column foot adopts shape of rim of a cup foundation,with buried depth of 2.2 meters,and single steel column weighing about 28 tons,a total of 22

Steel beam: tube truss steel structure,span 33 meters,12 meters bay,33m main span on each side of 17.445 and 14.26m auxiliary span, auxiliary span for two or three layer structure,
Five storeys platform in the main span.And among messy distribution of platform steel column are criss-cross with civil foundation.
With the steel structure warehouse building, customers can choose from a variety of structures, ranging from simple two-bay warehouses to large industrial and commercial buildings. The steel frame of this prefab warehouse is unique in that it can be built within a short period of time without any trouble involved. Furthermore, this kind of storage center benefits from extremely low maintenance costs and can withstand even harsh weather conditions.
The Prefab steel structure warehouse is custom-designed to meet any industrial or commercial storage needs. This steel structure warehouse building supports any crane with different lifting capacities and can accommodate vehicular traffic on the ground level. The warehouse building is specifically designed for large and medium-sized warehouses. By enclosing the main steel frame with wall and roof, it can provide an enclosed structure for indoor storage of goods. A mezzanine area can be used as an office to meet the needs of material transportation, storage and processing.
Specifications
1) Size: MOQ is 200m2, width X length X eave height, roof slope
2) Type: Single slope, double slope, muti slope; Single span, double-span, Multi-span, single floor, double floors!
3) Base: Cement and steel foundation bolts
4) Column and beam: Material Q345(S355JR)or Q235(S235JR) steel, all bolts connection! Straight cross-section or Variable Cross-section!
5) Surface: Paint or hot DIP galvanized
6) Others: Steel structure workshop, Prefabricated Building, Steel Structure, Warehouse, Workshop, Temporary offices, Light Steel Structure Workshop, Heavy Steel Structure, Steel Structure Warehouse Building etc.
FAQ
1. What kind of company you are?
We are steel structure building Manufacturer located in Qingdao China, We were gaining good reputation among our customers for our professional, warm and thoughtful service. Because we know that a long terms business based on the quality control, price, packing, delivery time etc.
2. Does your company is a factory or trade company?
We are factory, so you will enjoy the best price and competitive price. Our factory covers an area of 150,000 square meters.
3. Whats the quality assurance you provided and how do you control quality ?
Established a procedure to check products at all stages of the manufacturing process - raw materials, in process materials, validated or tested materials, finished goods, etc.
4. Can you offer designing service?
Yes, we have more than 100 design engineers. We could design full solution drawings as per your requirements. They use software: Auto CAD,PKPM, MTS, 3D3S, Tarch, Tekla Structures(X steel)V12.0.etc.
5. Do you offer guiding installation on site overseas?
Yes, we can provide the service of installation, supervision and training by extra. We can send our professional technical engineer to supervise installation on site overseas. Besides, We also have our own abroad guiding installation team consisting of more than 30 people.


Please feel free to contact Ferchichi for more information.