Product Description
Prefabrcaited steel structure carport
Steel structure refinery building construction project is a structural steel building in the refinery industry.Refinery buildings requires the architect considering the structure request of refinery construction project.
Project introduction:The Steel structure refinery building construction project was built in Costa Rica which is for the purpose of refinery facility in a industrial park.With the size of 185m(length)*55m(width),it took 3 months to complete the project.
Technical features of Steel structure refinery building construction project
For a steel structure storage warehouse building,there are the following components:
I.Primary Frame
II.Secondary members
III.Wall and roof system
IV.Accessories
|
Specification
|
Length
|
Single slope, double slope, muti slope
|
Width
|
Single span, double-span, Multi-span
|
Height
|
single floor, double floors
|
Column
|
Q235, Q345 welding H section steel
|
Beam
|
Q235, Q345 welding H section steel
|
Purlin
|
Q235 C channel or Z channel
|
Knee brace
|
Q235 angle steel
|
Vertical and transversal support
|
Q235 angle steel, round bar or steel pipe
|
Tie ba r
|
Q235 steel pipe
|
Brace
|
Q235 round bar
|
Sleeve
|
Q235 steel pipe
|
Cladding system
|
sandwich panels (EPS, PU, Fiber glass wool etc.) or can use corrugated steel sheet
with fiber glass wool insulation and steel wire gauze.
|
Pa r tition wall
|
sandwich panels (EPS, PU, Fiber glass wool etc.)
|
Second floor
|
floor deck
|
Second floor office
|
fiber cement board floor panel or checkered steel plate
|
Stair:
|
Q235 steel structure with checkered steel plate
|
Ventilation:
|
ventilator
|
Door
|
sandwich panel sliding door or roller door
|
Windows
|
PVC or Aluminum
|
Water
|
Provided plan, design and technical service.
|
Electricity
|
Provided plan, design and technical service.
|
Gutter
|
stainless steel or color steel sheet
|
Rainspout:
|
PVC
|
Live load on roof
|
In 120kg/Sqm (Color steel panel surrounded)
|
Wind resistance grade
|
12
|
Earthquake-resistance
|
8 degree |
Detailed Photos
The primary frame is referring to the weled H section steel columns/beam.
(2)Secondary members
Secondary members mainly refer to the purlins and bracing system for the metal warehouse construction.
A:Purlins
The purpose of the purlin is to transmit the roof/wall load upon beams/columns.Purlins usually come in the way of C and Z purlin.
C purlin-specs:(50/80-120/300-50/80)
Z purlin-spec: (40/80-80/300-40/80)
B:Bracing system
Bracing system includes column bracing,roof bracing,knee bracing, tie beam, tie bar etc.
- Knee bracing-connection part between roof purlin and beam lower flange plate
- Wall and roof system.
The warehouse building apply the fiberglass wool sandwich panel.
(4)Accessory
The accessory mainly includes the doors,window,trim package,fasteners,skylight,ventilator,gutter,down pipe,glues etc.
Besides design and manufacturing,KXD could send our installation worker to local construction site to help the erection of the refinery building construction.
Steel pallet packing as a whole:
Customer visit our facotry:
FAQ
1. What kind of company you are?
We are steel structure building Manufacturer located in Qingdao China, We were gaining good reputation among our customers for our professional, warm and thoughtful service. Because we know that a long terms business based on the quality control, price, packing, delivery time etc.
2. Does your company is a factory or trade company?
We are factory, so you will enjoy the best price and competitive price. Our factory covers an area of 150,000 square meters.
3. Whats the quality assurance you provided and how do you control quality ?
Established a procedure to check products at all stages of the manufacturing process - raw materials, in process materials, validated or tested materials, finished goods, etc.
4. Can you offer designing service?
Yes, we have more than 100 design engineers. We could design full solution drawings as per your requirements. They use software: Auto CAD,PKPM, MTS, 3D3S, Tarch, Tekla Structures(X steel)V12.0.etc.
5. Do you offer guiding installation on site overseas?
Yes, we can provide the service of installation, supervision and training by extra. We can send our professional technical engineer to supervise installation on site overseas. Besides, We also have our own abroad guiding installation team consisting of more than 30 people.