Steel Structure Logistics Warehouse Project (KXD-SSW117)
Steel structure building is widely used as workshop, warehouse, factory, hotel, church, garage, poultry house, etc. It is durable, economic and environmentally friendly.
Steel Structure Logistics Warehouse
1) Different sizes:
MOQ is 200m2, width X length X eave height;
2) Different types:
Single slope;
Double slope;
Single span;
Double span;
Multi-span;
Single floor, double floors.
3) Different Bases:
Cement and steel foundation bolts.
4) Different Columns and Beams:
Material Q345(S355JR) or Q235(S235JR) steel, all bolt connections, straight cross-section or variable cross-section.
5) Different bracings:
X-type or V-type or other type bracing made from angle, round pipe, etc.
6) Different Purlins:
C or Z type: Size from C120~C320, Z100~Z200.
7) Different Roof and Wall Panel:
Single colorful corrugated steel sheet 0.326~0.8mm thick, (1150mm wide), or sandwich panel with EPS, Glass wool, PU insulation, thickness around 50mm~100mm.
8) All accessories:
Semi-transparent skylight belts, ventilators, down pipe, galvanized gutter, etc.
9) Surface:
Two lays of Anti-Rust Paint.
10) Packing:
Main steel frame without packing load in 40OT', roof and wall panel load in 40HQ'.
You ONLY need you to provide us with the following information:
Prefabricated steel structure buildings - Optimal solution for your projects
If you want a building that has cost saving, fast erection, good quality control, high durability, steel structure buildings will be the best choice.
As the latest trend in building construction, steel structure buildings increasingly confirmed their outstanding advantages in agricultural, industrial and commercial projects such as warehouse, workshop, factory, storage, showroom, office building, supermarket, school, stadium, logistics center, etc…
What is prefabricated steel structure building?
Steel structure building is built over three members connected to each other by bolts and screws:
Primary members (columns, beams)
Steel columns will be H section steel, square tube steel according to different type of buildings. Steel beams are usually H section steel.
Secondary members (C or Z purlins, bracing...)
Roof and wall sheeting or sandwich panel (EPS, fiberglass wool, PU sandwich panel)
Other building components (Rolling doors, aluminium windows, etc.)
The entire primary members and secondary members are designed and fully fabricated including cut-to-length, punching, drilling, welding and performing in the factory before shipping to the site for erection.
At the site, all components are assembled and jointed via nut & bolt connections; thereby reducing the costs and assembly times.
These buildings can be provided with different structural and non-structural additions such as ventilators, doors & windows, trusses, mezzanine floors, canopies, crane, insulation…, based on the customer's requirements.
Why choose steel structure buildings?
1. Cost Savings
Price per square meter can be 25% lower than conventional buildings. Site erection cost is low because of faster erection times and easier process.
2. Quality Control
Designed and fabricated in-factory with strict quality control. The fabrication process includes design and engineering, as well as detailing and manufacturing at the factory.
3. Quick Erection
All steel components are fabricated at the factory and linked by bolts at the site. So the erection process is fast, step by step, easy to install.
4. Flexibility
Steel buildings are flexible in any requirement of design, easy to expand in the future and also economically with low transportation costs.
5. Energy Efficiency
Nowadays, steel buildings are the green solution for the environment with CO2 reduction, energy efficiency, and recycle.
How to build a steel building with KXD?
Each of KXD's steel building is custom-made to meet the needs of our customers with high performance, efficiency and international quality standards.
Factors affecting the price of steel structure building:
1. Steel raw material price
Fluctuations of steel raw material price have impact on the price of steel structure building. The big change in steel price will directly cause the overall price of steel structure building to change.
2. Load
Load includes wind load, snow load, dead load, and live load. The engineers calculate the steel structure Qty. based on the load. Large load, more steel structure will be used.
3. The span of the steel frame
Usually, the span of steel frame will controlled in 36m. The larger of the span, the greater the amount of steel structure per square meter. If the steel frame has a large span and no center pillar, the amount of steel used will increase.
4. Structure
If the building has glass curtain wall, crane or mezzanine floor, canopy, etc., to ensure the safe, steel structure will be increased.
If you are looking for a competitive price and good quality steel buildings manufacturer, please contact KXD for our advice.
Fill the form or send us an email to request a quotation to KXD's professional advisory team.
Size of the warehouse, length*width*eave height*ridge height; |
Max. wind speed in site; |
Max. snow load if have snow; |
Roof and wall material; color steel sheet or sandwich panel; |
Need crane or not; |
Steel structure is painted or galvanized; |
Please feel free to contact Ferchichi for more information thanks.