Customization: | Available |
---|---|
After-sales Service: | Over 50 Year Limited Warranty |
Warranty: | Over 10 Year Limited Warranty |
Still deciding? Get samples of US$ 200/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
H steel Character | |
Usage | H column & H beam |
Classification | Wide flange H beam (HW) Flange H beam (HM) Narrow flange H beam (HN) |
Product Technique | Hot rolled, cold-bend, welded |
Our production ability | 5000 Ton/Month |
Material Grade | Q235B, Q355, Q355B |
Size | Height:(H): 100-900mm Width(B): 100-408mm Thickness(T1): 6-21mm Thickness(T2): 8-35mm Length: 6meters-12meters |
Application | Widely used as prefab building steel structure frame, such as frame of workshop, warehouse, factory, office building, shopping mall, high rise building, farm building, bridge, machine platform, etc. |
Advantage | High strength, Light weight, Cycle use, Easy transport, Quick install,Low price |
Steel is the most important building material in the world because of its light weight and high strength. Steel has the highest strength-to-weight ratio of all building materials, meaning that its members add strength without adding stress to the building frame.
This advantage gives our engineers team more flexibility when designing structure. The steel church building be easily modified the layout and designed clear span to meet lager space requirement. Another major benefit of steel church building is its lower cost and less waste compared to traditional building materials. More larger the building is, more cost will be saved. Not only the steel price is lower, but also the groundwork will be smaller. Also, As an environmentally friendly material, steel almost no waste and can reduce energy costs and save you a lot of money over time.
Prefab Building Steel Structure System Inspection |
||
Main components | Base | Cement and steel foundation bolts |
Main frame | H-section steel | |
Material | Q235B, Q345B or others as buyers' requests. | |
Purlin | C / Z Steel: Size from C120~C320, Z100~Z20 | |
Bracing | X-type or other type bracing made from angle, round pipe | |
Bolt | Plain bolt and High-strength bolt | |
Roof & wall | Sandwich panel or Single steel sheet | |
Door | Sliding door / Rolling door / Securing door | |
Window | Aluminium alloy frame | |
Surface | Total four layers of Anti-rust Painting or Galvanized | |
Application | 1. workshop/ warehouse/factory 2. Storage/ garage/shed,/hanger 3. Animal Farm (please confirm what kind of animal) 4. steel building, modular house 5. Steel H-column and steel H-beam Structure 6. High rise building project, like tank tower 7. Others steel structure buildings materials |
|
Packing | Main steel frame without packing load in 40' OT Steel pallet packing load in 20 / 40GP, HQ |
|
Drawing: | AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. to design | |
Design Parameters |
If you need our design, please help to confirm as belows for quickly quotation. | |
1, Project location(country/area) | ||
2, Size( Length × Width × Height cm) | ||
3, Snow load (Max. snow thickness ) | ||
4, Wind load (Max. Wind speed Kn/m2 km/h m/s) | ||
5, Seismic magnitude | ||
6, Middle Column allowed or not | ||
7, Brickwall allowed or not (cm) | ||
8, Door&Window Quantity&Size | ||
9, Crane allowed or not? Tons? |
Factories |
Warehouse/Workshop |
High rise building |
Plant |
Storage/Shed/Carport |
Sports Stadium |
Shopping mall |
Poultry house |
Office building |