Customization: | Available |
---|---|
Connection Form: | Bolt Connection |
Material: | Steel Structure |
Still deciding? Get samples of US$ 450/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
An abandoned aquaculture farm was turned into a aquatic convention center. The whole building adopts steel and wood structure, and is designed from six aspects of "characteristic type, ecological type, introversion, landscape, standardization and scale". The novel architectural form inspires the imagination of every guest. Entering the water center, with its 8-meter clear height, glass dome and steel and wood elements, makes people feel as if they are coming to an art palace.
Advantages |
|
Faster installation |
Single source responsibility |
Lower cost |
Flexibility in expansion |
Large clear spans |
Quality control |
Low maintenance |
Energy efficient roof and wall systems |
Architectural versatility |
Optimized design of steel reducing weight |
Quick delivery and Quick turn-key construction. |
Water-tight roofs & wall coverings |
Pre-painted and has low maintenance requirement. |
The building can be dismantled and relocated easily. |
Clear spans up to 100m without internal columns |
Flexibility in building dimensions |
Fixed deadlines and costs |
|
Weather-tight roof and wall coverings with accessories for long maintenance free exteriors. |
By choosing KXD, you will get:
1. Full package of designing, engineering, detailing process for your project. You just send me a preliminary plan/sketch or only tell me the size and requirements for your project, the rest work is ours;
2. CE and ISO 9001 certified manufacturer with 30-40 days lead time;
3. Comprehensive steel building products scope and wide network of supplier in terms of any other construction/decoration materials and products