Light Guage Steel Prefab Porta Cabins for Labor Camp

Product Details
Customization: Available
Usage: Warehouse, Temporary Offices, Workshop
Material: Steel Structure
Manufacturer/Factory, Trading Company, Group Corporation
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000
Export Year
2004-03-01
  • Light Guage Steel Prefab Porta Cabins for Labor Camp
  • Light Guage Steel Prefab Porta Cabins for Labor Camp
  • Light Guage Steel Prefab Porta Cabins for Labor Camp
  • Light Guage Steel Prefab Porta Cabins for Labor Camp
  • Light Guage Steel Prefab Porta Cabins for Labor Camp
  • Light Guage Steel Prefab Porta Cabins for Labor Camp
Find Similar Products

Basic Info.

Model NO.
KXD-PH1504
Certification
ISO, GB, SGS
Customized
Customized
Main Steel Frame Matarial
Square Tube Column, Z or C Purlin
Color Reference
Ral
Member of Enginering Team
20
Quality Control
Daily
Life Cycle
50 Years
Construction Period
4 Weeks
Customer Service
Aftesale Service
Project Management
Turnkey Solution
Engineering Tools
CAD
Type
H-Section Steel
Standard
GB
Trademark
Carbon Structural Steel, kxd
Forming
Hot-Rolled Steel
Connection Form
Welded Connection
Member
Steel Column
Type of Steel For Building Structure
H-Section Steel
Carbon Structural Steel
Q235
Residential Wall Structure
Wallboard
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Steel Structure Bridge
Warranty
30 Year Limited Warranty
Transport Package
Seaworthy Package
Specification
SGS / ISO/BV
Origin
China
HS Code
9406000090
Production Capacity
2000ton/Month

Product Description

Light Guage Steel Prefab Porta Cabins for Labor Camp
Light Guage Steel Prefab Porta Cabins for Labor Camp

Light Guage Steel Prefab Porta Cabins for Labor Camp
Light Guage Steel Prefab Porta Cabins for Labor Camp
1)Nice appearance
2)Precision welding
3)Heat insulation
4)Meeting different requests

Main structure: Welding H steel

Purlin: C section channel or Z section channel

Roof cladding: Sandwich panel or corrugated steel sheet with fiber glass wool coil

Wall cladding: Sandwich panel or corrugated steel sheet

Tie rod: Circular steel tube

Brace: Round bar

Column barcing and transverse brace: Angle steel or H section steel or steel pipe

Knee brace: Angle steel

Roof ridge: Corrugated steel sheet

Wrapping cover: Color steel sheet

Roof gutter: Color steel sheet

Rainspout: PVC pipe

Doors: Sliding sandwich panel door or metal door

Windows: PVC or aluminum window

Connecting: High strength bolts
Light Guage Steel Prefab Porta Cabins for Labor CampLight Guage Steel Prefab Porta Cabins for Labor Camp
Characteristics:

Environment-friendly

Lower cost and maintenance easily

Long using time up to 50 years

Stable and earthquake resistance up to 9 grade

Fast construction, time saving and labor saving


Please contact me: Ms tracy
 Light Guage Steel Prefab Porta Cabins for Labor CampLight Guage Steel Prefab Porta Cabins for Labor Camp
Steel house technical specification
No. Sort Name Specification
1 Product Type Degree of Standardization custom-made product, design and manufacture according to clients requirement
2 Size Length (m): No limited, increase expansion joint when length more than 200m.
3 Width(m): single span should be less than 12m, an arbitrary  width could make by union spans 
4 Heigth(m): single floor≤ 5m, two or three floors, average height ≤ 4m
5 Roof slope: slope is 1: 10~1: 5
6 Floors: less than 3 floors
7 Standard equipment Ground channel Galvanized steel panle compression, thickness is 0.8mm
8 Post Inside post is steel square pipe, material is Q235, components surface make antirust process, and decorate with color steel compression parts.
9 Roof beam roof truss consist of thin sharpe steel by welding, component surface make antirust process
10 Purlin purlin is Ctype steel, material is Q235, components surface make antirust process.
11 Wall beam wall beam is Ctype steel or square pipe, material is Q235, component surface make antirust process
12 Floor made of floor master beam, secondary beam and floor surface plate(plywood)
13 wallboard 50~150mm thickness double surface color steel sandwich panel, white color
14 roof board 50~150mm thickness double surface color steel corrugated sandwich panel, blue or red color
15 door color steel sandwich panel door, size: 750mm*2000mm;
16 window PVC sliding window, with steel screen.
17 Options Ceiling mineral wool acoustic panel, aluminium buckle panel, PVC ceiling 
18 Elevation floor Design based on local weather condition.
19 Canopy color steel sheet or color steel sandwich panel canopy
20 door compound wooden door, security door, aluminium alloy door
21 Electrical accessories Supply plan, design and construction according to relevant national norms(220V, 50Hz, with lamp, switches and multi-function sockets. )
22 Water plumbing accessories Supply plan, design and construction according to relevant national norms
23 Sanitary ware Supply according to customer needs
24 Furniture and electric appliance Supply according to customer needs
25 Design technical data Roof dead load 0.3KN/sqm
26 Roof live load 0.5KN/sqm
27 Floor dead load 0.5KN/sqm
28 Floor live load 2KN/sqm
29 Wind load 12degree, 120km/h(strengthen the steel frame when the wind is bigger than this data)
30 Earthquake resistant intensity 8 degree
31 Used for temperature Celsius: from -25 to+50 (change the design when the temperature is lower than Celsius -25)
32 Installation Installation tools electric drill, electric hammer, spanner, screwdriver, pulling rivet etc, house installation need electric power.
33 Installation efficiency Four skilled labor one day can erect 40m2' s house body
34 Transport container each 40ft container could load 130~150Sqm house body material
Light Guage Steel Prefab Porta Cabins for Labor Camp
KXD's H Section Manufacturing Equipment and Process
Steel plate cutting→H section assembly→Automatic welding-H section strengthening→Assembly→Manual welding→Shot blasting-Painting→
Storage

I.Steel plate cutting
The H section  steel plate should be checked again by the factory and shall be applied under the condition of up to design and specified requirements after checking. Steel plate cutting should be aimed at quality guarantee and material saving. For each process like plate cutting,H type assembly, components assembly and pre-assembly should be carried out by profession setting-out worker precisely on processing surface and assembly sample plates.To guarantee the accuracy of the components'geometrical dimension,tolerance of form and position, angle and contact surface,inspection is necessary by inspector after setting out.In order to ensure the cutting quality,the surface of the ultra-thick plate is subjected to the surface carburizing hardness test before cutting.The CNC cutting equipment is preferred for cutting.The high purity 98.0% acrylic gas and 99.99% liquid oxygen gas are used to guarantee the smoothness and flatness of the cutting surface without notches and slags.The groove is cut by a special imported cutting machine.


Equipment name: Portable CNC Fire-cutting machine
Model No.: CNCDG-1530
Application feature: steel plate cutting(5-100mm plate cutting thickness), beveling of the edge.Advantageous in small equipment and easy-to-move. Mainly for cutting regular and irregular small components and beveling of the plate.

Equipment name:Straight flame cutting machine

Model No.:DZCG-4000A
Application feature:steel plate cutting(5-100mm plate cutting thickness),Y flange plate, web plate cutting, effective cutting width: 3200mm


Equipment name:CNC cutting machine
Model No.:CNC-4000C
Application feature:steel plate cutting(5-100mm plate cutting thickness),Y flange plate,web plate and irregular component cutting,effective cutting width: 3200mm

Equipment name: Radial drilling machine
Model No.:Z3050*16/1 
Application feature:Maximum drilling diameter φ50mm,Mainly for processing of component bolt-connection holes


Equipment name:Puncher machine
Model No.:JH21-400
Application feature:Maximum stamping pressure-400 ton,Mainly for plate punching, blanking, bending and shallow stretching


Equipment name:Shearing machine 
Model No.:Q11Y-25*2500 
Application feature:cutting width 2500mm and cutting thickness 3-25mm


II.H section steel assembly
The assembly process is set up on the imported H section production line.4 hydraulic positioning system press firmly against between the upper/lower flange and web plates in position. The adjust the parallelism of the flange plates and perpendicularity between flange and web plates and get them fixed after. The fixing welding should adopt C02 gas shielded welding.

Equipment name:H section steel assembly machine

Model No.:Z20B
Application feature:mainly for H type assembly u,flange width 150-800mm,web height 160-2000 mm

III.Automatic welding

The H section steel members will be hoisted into the gantry-type submerged arc automatic welding machine for welding.The welding process should be carried out in accordance with specified welding sequence and regulation parameters.Preheating, which uses the electrical heaters, is necessary for the ultra-thick plates of components.The set temperature shall be determined based on the specified one.Please see factory welding process documents for detail.


Equipment name: Gantry-type submerged arc automatic welding machine  
Model No.:LHA5ZB
Application feature:Mainly for assembly welding of H section steel whose maximum cross section up to 800mm×2000mm

IV.H section steel strengthening machine
H section steel strengthening process: Correction of flange flatness by using H section steel flange plate strengthening machine.Flame-correct the perpendicularity between the H section flange and web plate under special circumstances and then correct the side bending of the H section steel. The flame temperature should be controlled under the range of 600~800ºC.


Equipment name:H section steel strengthening machine  
Model No.:YTJ60B
Application feature:Mainly for correcting the deformation of I beam or H section steel flange plate during welding process,flange width 200-1000mm, flange thickness≤60mm, web height≥350mm


Equipment name:H section flange strengthening machine
Model No.: HYJ-800
Application feature:Mainly for correcting the deformation of I beam or H section steel flange plate during welding process,flange width 160-800mm,flange thickness≤40mm,web height≥160mm

V.Simulated assembly of component
1.Get familiar with component shop drawing and technical requirements.
2.The model components need to re-check by related department after making and finalizing of the model components and then to assemble.
3.Accurate mark-up
4.Inspect the component after first assembly.For multi-group components, pre-assembly for the first group and then batch assembly after qualified test.


VI.Manual welding

VII.Shot blasting

Equipment name:10-ramming heads shot blasting machine

Model No.:QH1525    
Application feature:Mainly for shot blasting of section steels including H section steel, welded members and steel plate,10 ramming head; Machine entry size:1500Í2500 and member at 1200Í2000 size could pass the machine at once; up to Sa2.5 Grade.


VIII.Painting
The surface of the members should be in even,flat, glossy and full painting without manifest of cracking, peeling and pin holing.The color and coating thickness should also meet design requirements.If there is no certain requirements,the following standards should be followed:thickness is 150μm indoor while 125μm outdoor.The allowable deviation is -25μm.The allowable deviation of dry paint film thickness for each-time painting
Two coats of primer:thickness being40±5μm; Two coats of finish paint:thickness being 60±5μm.


Equipment name:Airless sprayer     
Model No.:CPQ9CA
Application feature: Derived capacity:56 L/min,Air consumption:50~1200 L/min.Mainly for surface paint of structural members, Pressure ration: 32:1
Process, fabrication and quality control standard on welding groove/beveling of steel structure
1. Purpose
To ensure the welding quality, meeting up the technical requirements of welded members and improve the standardization of our fabrication, we specially formulate this regulation.
2. Application scope
This manual apply for the design, fabricate and inspection of groove joint in terms of manual arc welding, CO2 arch welding, mixed gas arch welding, submerged arc welding and electroslag welding.
3. Design of welding groove
3.1 Key points on design welding groove:
In order to obtain quality groove, it is necessary to choose appropriate form of groove. The option of groove mainly depends on the thickness of base metal, welding method and craftsmanship requirements.The followings are the factors we need to consider:
  1. minimize the amount of filler metal
  2. easy for beveling
  3. in convenience for welding operation and slag removal
  4. After welding stress and deformation should be as small as possible

3.2 Groove direction:
We will consider the following factors for the groove direction:
A)in favor of welding process and removing slag and leave enough space for welding process on the fusion face
B)minimize the times of flip-flop during welding
C)way of fit-up in actual welding

3.3. Regulation on groove direction of members:

3.3.1 Butt welding on H section rafter/column (when CJP-complete joint penetration and single side fusion is required)
1) When there is no welding backing, the groove orientation on flange plates should be same and falls on the direction in favor of welding on web plats(same rules apply for the PJP situation). Please refer to illustration 1
Light Guage Steel Prefab Porta Cabins for Labor Camp
2)When there is welding backing, we require the groove direction being outward for the flange plates(opposite direction for web plates) and still falls on the direction in favor of welding on web plates. Please refer to illustration 2
Light Guage Steel Prefab Porta Cabins for Labor Camp3)Butt-welding on construction site:we require all the grooves should be bevelled on the upper rafter/column when it comes to bolt connection for web plates(see illustration 3). For the scenario of welding on web plates, please refer to the illustration 4.
Light Guage Steel Prefab Porta Cabins for Labor CampLight Guage Steel Prefab Porta Cabins for Labor Camp3.3.2 Box column(groove on itself).See illustration 5

Light Guage Steel Prefab Porta Cabins for Labor Camp4. Welding groove form
4.1. Mark on form and size of welding joint groove:
Light Guage Steel Prefab Porta Cabins for Labor CampExample: Shielded metal arch welding, complete joint penetration, butt welding, I shape groove, welding backing and single side weld would be marked MC-BI-BS1
4.2. For the mark of welding method and penetration type, please see the following chart 1.
Chart 1 Mark on welding method and penetration type
Mark Welding method Penetration type
MC Shielded metal arch welding CJP-complete joint penetration
MP PJP-partial joint penetration
GC Shielded arch welding
Self-shielded arc welding
CJP-complete joint penetration
GP PJP-partial joint penetration
SC Submerged arc welding CJP-complete joint penetration
SP PJP-partial joint penetration
SL Electroslag welding  
 4.3. For the mark of single, double side welding and backing material type, please see the following chart 2
Chart 2 Single/double side welding and backing material type mark
Backing material type Single/double side welding
Mark Material Mark Single/double side welding
BS Metal backing 1 Single side welding
BF Other backing 2 Double side welding
4.4. Mark on each part size of groove, see chart 3.
Chart 3 Size mark on groove
Mark Size of each part on groove
t Thickness of welding plate(mm)
b Groove root gap or gap between two members(mm)
h Groove depth(mm)
p Groove roof face(mm)
α Groove angle(º)

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier