• Light Weight Steel Structure Prefab Cabins
  • Light Weight Steel Structure Prefab Cabins
  • Light Weight Steel Structure Prefab Cabins
  • Light Weight Steel Structure Prefab Cabins
  • Light Weight Steel Structure Prefab Cabins
  • Light Weight Steel Structure Prefab Cabins

Light Weight Steel Structure Prefab Cabins

Material: Steel Structure
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop
Certification: ISO, SGS
Customized: Customized
Size: According to Customers′ Requirement.
Roof/Wall Panel: EPS/Fiberglass Wool/PU
Customization:
Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company, Group Corporation

Basic Info.

Model NO.
KXD-VT003
Raw Material
Steel Structure
Storey
1-3
Connect
Bolt
Window
Aluminium Alloy
Door
Steel Door
Transport Package
Standard Package for Exporting Prefabricated House
Specification
SGS, ISO
Trademark
KXD
Origin
Qingdao, China
HS Code
9406000090
Production Capacity
2000ton/Month

Product Description

General technical description for standard prefabricated house worker camp
 
Technical Parameter:
Project Introduction:
Site:Peru
Designor&contractor:KXD
Size:10.3m*11.45*6.5m(2 floors)
Interior layout:2 apartments in total.
Ground floor:kitchen,dining room,small bathroom,living room
First floor:3 bedrooms+bathroom

Technical datas of Peru steel frame structure residential Building Construction
I.Main frame
The main frame includes the column and mezzanine girder/beam.The column is Q235, rectangular hollow section and mezzanine beam is Q235, hot-rolling H section steel.

Light Weight Steel Structure Prefab Cabins

II.Flooring system:
Decking floor 688 type,1mm
Mudguard sheet 2mm galvanized bending
Stud φ16

The floor systems are covered:
  • Composite beams and composite slabs with steel decking
  • Long-span composite beams often with service openings
  • Cellular composite beams with composite slabs and steel decking
  • Integrated beams with precast concrete units
  • Composite and non-composite beams with precast concrete units.
  Light Weight Steel Structure Prefab Cabins

III.Wall panels

About the wall panel,we recommend the cement foam panel.

Light Weight Steel Structure Prefab Cabins
 

Advantages of structural steel system for the residential building:
Structural steel framing has long been recognized as a high-strength, dimensionally predictable, rapidly erected framing material.  The selection of a structural steel framing system for a multi-story residential project provides significant benefits to the project, including:
  • Low floor-to-floor heights and maximized floor-to-ceiling heights using steel framing elements and thin-floor systems
  • Flexible spaces thanks to column-free areas-ideal for amenities and a mixture of unit types (link to space utilization page)
  • Enhanced framing quality through the use of  a long-lasting, durable, high-quality material fabricated off-site to tight tolerances (Quality page link)
  • Adaptiveness, as a steel framing system is simpler to expand or remodel (Adaptability page link)
  • Reduced foundation loads, column footprint and overall project costs thanks to steel's lightweight properties  (Comparison of other material link)
  • Earlier building occupancy thanks to quick  erection, which reduces overall on-site construction, labor and associated time and costs  (link to Schedule page)
Structural steel framing systems are competitive with alternative framing materials -- with the "sweet spot" for buildings five stories and above. Explore the following Multifamily framing concepts to find the best solution for your next project.

Specs charts
No. Sort Name Specification
1 Specification length No limited
2 Width Less than 11m
3 Wall height 2600mm/2800mm
4 Clear height 2600mm/2800mm
5 Roof slope 15°
6 Standard accessory Wall board 75mm thickness double color-steel sandwich panel with polystyrene foam inside. Heat Insulated coefficient is 0.041w/m.k. Heat transfer coefficient is 0.546w/ m².k.
7 False ceiling 75mm thickness double color-steel sandwich panel with polystyrene foam inside. Heat Insulated coefficient is 0.041w/m.k. Heat transfer coefficient is 0.546w/ m².k.
8 Roof board color steel corrugated sheet, 0.5mm thickness
9 Outside door Security door, single door with dimensions of 900*2100mm, furnished with a handle lock with 3keys. Doorframe is made of 1.2mm steel, and door is made of 0.7 mm steel, 90mm thick rock wool insulation foam.
10 Inside door SIP, single door with dimensions of 750*2000mm, furnished with a cylinder lock with 3keys. Doorframe is made of aluminum, 50mm thick EPS insulation foam.
11 Window(W-1) PVC, white color, with dimensions of 1200*1200mm, glazed with glass in a thickness of 5mm, two bay fixed, and two bay sliding, supplied with fly screen.
12 Window(W-2) PVC, white color, with dimensions 500*500mm, glazed with glass in a thickness of 5mm, casement opening, supplied with fly screen.
13 Channel Galvanized Steel Plain Sheet press moulding Material: Q235. Painted
14 Post Square steel tube Material: Q235. Painted
15 Purline Square steel tube Material: Q235. Painted
16 Roof truss Square steel tube Material: Q235. Painted
17 Decoration and connection color steel sheet, 0.35mm thickness
18 Option Decorative floor PVC, laminated or ceramic tile
19 Drainage system Provided plan, design and construction
20 Electric system Provided plan, design and construction
21 Technical parameter Bearing load 30kg/m2
22 Wind pressure: 0.45KN/M2
23 Fire proof B2 grade
24 Resistant temperature -20 ºC to 50ºC


Technical Parameter of standard prefabricated house:
1. Wind resistance: Grade 11(wind speed≤ 120km/h)
2. Earthquake resistance: Grade 7
3. Live load capacity of roofing: 0.6kn/m2
4. External and internal wall heat transmission coefficient: 0.35Kcal/m2hc
5. Second Floor Load Capacity: 150 kg/m2
6. Live load of corridor is 2.0kn/ m2
7. Wall permitted loading: 0.6KN/ m2
8. Ceiling Permitted live loading: 0.5 KN/m2
9. Wall Coefficient of thermal conductivity: K=0.442W/m2k
10. Ceiling Coefficient of thermal conductivity: K=0.55W/ m2K

Steel framework

Main column: fabricated by 80*80 or 100*100 or 120*120 or 150*150 Square Tube, Q235 Steel  Surface working: Alkyd painting,two primary and two surface. 

Main triangle Beam:  fabricated by C80, C100, C120, C140 Section steel, Q235 Steel, Surface working: Alkyd painting,two primary and two surface. 

Wall and roof purlin: C80, C100, C120, C140 Section steel, Q235 Steel,
Surface working: Galvanized 

 
Floor
 
Groud floor will be the concrete foundation with Ceramic tiles or PVC floor leather.
First floor:  18mm plywood  with 2.0mm PVC floor leather for living rooms floor;  
 
Ceiling
 
Construction:
6mm Gypsum board for dry room
12mm PVC ceiling for wet room
 
Walls
 

Insulated Steel Sandwich Panel wall
Panel width: 950mm;
Thickness: 50-120mm.
Powder coated Color steel on both sides:  0.4mm/0.5mm/0.6mm
Insulation: Polystyrene, Rockwool or Polyurethane
Density of Rockwool: 120Kg/m3 
Density of Polystyrene: 12Kg/m3, 16KG/M3 20KG/M3
Density of Polyurethane: 40Kg/m3

Door
 
External door: Insulated with opening dimension 950*2100mm, furnished with lock   
with 3keys. Inner door: Insulated steel door.
 
Windows
 
Window material: PVC window with fly screen, 4mm glass. 
 
Electrical fittings option
 
Electrical wire, 2.5mm2 for lighting system, and 4mm2 for AC units.
16A five hole universal socket.
double tube fluorescent lamp, 220V,50-60HZ
Single Switch, Honyar brand, with junction box
Electrical distribution box, box+breakers+earth leakage protective device
 
Optional Water system fittings
 
Water drain pipe, PPR pipe, dim 16-20mm, connection fittings are made of copper, life span over 10 years.
Exhaust fan or air exchange hole, size 250mm*250mm made of steel or PVC
 
Sanitary ware:
Western Close tool: ceramic, with pipes and installation fittings
Urinal: ceramic, with pipes and installation fittings
Wash basin: ceramic, with post, faucet, pipes and installation fittings
Shower head, Shower base, Water mixture
 
 
 
Our Services
 
1. Professional design and engineering team: Full solution for site camp design. We could make the design for whole camp as per your requirement.
 
 
 
2. Procurement and Manufacture for all material for prefabricated building. We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO standard, to make sure the fabrication works with high technology.
 
 
 
3. Site management & Installation supervision, We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK.
 
 
 
FAQ
 
Why Choose Prefabricated house for Site Camp Solution? There are many advantages to modular camp construction for site camps including:
 
 
 
1. Speed of construction and camp installation Allows for the building and the site work to be completed simultaneously, reducing the overall completion schedule, all the Main Structures will be connect with bolts, no welding works. All the wall and roof structure, flooring will be fixed by Self-tapping Screw or nails, normal Carpenter team could make a good job!
 
 
 
2. Economical Solution, compare to concrete building, prefabricated building will be much more Economical
 
 
 
3. Ability to service remote locations Assembling a work camp close to the work site reduces travel time which reduces cost.
 
 
 
4. Long time span Well-built modular worker camps can last for 10, 15 or 20 years or more.
 
 
 
5.Safe and stable, Earthquake resistance: Grade 7, Wind resistance: Grade 11(wind speed≤ 120km/h)
 
 
 
 
Company Information
 
  
 
Qingdao KXD Steel Structure Co.,Ltd. is one of the largest manufacturers of the prefabricated house, Flat Pack container house, steel villas, and steel structure workshop and warehouse in China. We have been doing well in this field for more than 15 years, and we have exported our products to more than 40 countries as well as our domestic market  with  ISO9001 and SGS approval.
We would like to give fully support for your further inquiry!
No. Sort Name Specification
1 Specification length No limited
2 Width Less than 11m
3 Wall height 2600mm/2800mm
4 Clear height 2600mm/2800mm
5 Roof slope 15°
6 Standard accessory Wall board 75mm thickness double color-steel sandwich panel with polystyrene foam inside. Heat Insulated coefficient is 0.041w/m.k. Heat transfer coefficient is 0.546w/ m².k.
7 False ceiling 75mm thickness double color-steel sandwich panel with polystyrene foam inside. Heat Insulated coefficient is 0.041w/m.k. Heat transfer coefficient is 0.546w/ m².k.
8 Roof board color steel corrugated sheet, 0.5mm thickness
9 Outside door Security door, single door with dimensions of 900*2100mm, furnished with a handle lock with 3keys. Doorframe is made of 1.2mm steel, and door is made of 0.7 mm steel, 90mm thick rock wool insulation foam.
10 Inside door SIP, single door with dimensions of 750*2000mm, furnished with a cylinder lock with 3keys. Doorframe is made of aluminum, 50mm thick EPS insulation foam.
11 Window(W-1) PVC, white color, with dimensions of 1200*1200mm, glazed with glass in a thickness of 5mm, two bay fixed, and two bay sliding, supplied with fly screen.
12 Window(W-2) PVC, white color, with dimensions 500*500mm, glazed with glass in a thickness of 5mm, casement opening, supplied with fly screen.
13 Channel Galvanized Steel Plain Sheet press moulding Material: Q235. Painted
14 Post Square steel tube Material: Q235. Painted
15 Purline Square steel tube Material: Q235. Painted
16 Roof truss Square steel tube Material: Q235. Painted
17 Decoration and connection color steel sheet, 0.35mm thickness
18 Option Decorative floor PVC, laminated or ceramic tile
19 Drainage system Provided plan, design and construction
20 Electric system Provided plan, design and construction
21 Technical parameter Bearing load 30kg/m2
22 Wind pressure: 0.45KN/M2
23 Fire proof B2 grade
24 Resistant temperature -20 ºC to 50ºC
       
KXD's H Section Manufacturing Equipment and Process
Steel plate cutting→H section assembly→Automatic welding-H section strengthening→Assembly→Manual welding→Shot blasting-Painting→
Storage

I.Steel plate cutting
The H section  steel plate should be checked again by the factory and shall be applied under the condition of up to design and specified requirements after checking. Steel plate cutting should be aimed at quality guarantee and material saving. For each process like plate cutting,H type assembly, components assembly and pre-assembly should be carried out by profession setting-out worker precisely on processing surface and assembly sample plates.To guarantee the accuracy of the components'geometrical dimension,tolerance of form and position, angle and contact surface,inspection is necessary by inspector after setting out.In order to ensure the cutting quality,the surface of the ultra-thick plate is subjected to the surface carburizing hardness test before cutting.The CNC cutting equipment is preferred for cutting.The high purity 98.0% acrylic gas and 99.99% liquid oxygen gas are used to guarantee the smoothness and flatness of the cutting surface without notches and slags.The groove is cut by a special imported cutting machine.


Equipment name: Portable CNC Fire-cutting machine
Model No.: CNCDG-1530
Application feature: steel plate cutting(5-100mm plate cutting thickness), beveling of the edge.Advantageous in small equipment and easy-to-move. Mainly for cutting regular and irregular small components and beveling of the plate.

Equipment name:Straight flame cutting machine

Model No.:DZCG-4000A
Application feature:steel plate cutting(5-100mm plate cutting thickness),Y flange plate, web plate cutting, effective cutting width: 3200mm


Equipment name:CNC cutting machine
Model No.:CNC-4000C
Application feature:steel plate cutting(5-100mm plate cutting thickness),Y flange plate,web plate and irregular component cutting,effective cutting width: 3200mm

Equipment name: Radial drilling machine
Model No.:Z3050*16/1 
Application feature:Maximum drilling diameter φ50mm,Mainly for processing of component bolt-connection holes


Equipment name:Puncher machine
Model No.:JH21-400
Application feature:Maximum stamping pressure-400 ton,Mainly for plate punching, blanking, bending and shallow stretching


Equipment name:Shearing machine 
Model No.:Q11Y-25*2500 
Application feature:cutting width 2500mm and cutting thickness 3-25mm


II.H section steel assembly
The assembly process is set up on the imported H section production line.4 hydraulic positioning system press firmly against between the upper/lower flange and web plates in position. The adjust the parallelism of the flange plates and perpendicularity between flange and web plates and get them fixed after. The fixing welding should adopt C02 gas shielded welding.

Equipment name:H section steel assembly machine

Model No.:Z20B
Application feature:mainly for H type assembly u,flange width 150-800mm,web height 160-2000 mm

III.Automatic welding

The H section steel members will be hoisted into the gantry-type submerged arc automatic welding machine for welding.The welding process should be carried out in accordance with specified welding sequence and regulation parameters.Preheating, which uses the electrical heaters, is necessary for the ultra-thick plates of components.The set temperature shall be determined based on the specified one.Please see factory welding process documents for detail.


Equipment name: Gantry-type submerged arc automatic welding machine  
Model No.:LHA5ZB
Application feature:Mainly for assembly welding of H section steel whose maximum cross section up to 800mm×2000mm

IV.H section steel strengthening machine
H section steel strengthening process: Correction of flange flatness by using H section steel flange plate strengthening machine.Flame-correct the perpendicularity between the H section flange and web plate under special circumstances and then correct the side bending of the H section steel. The flame temperature should be controlled under the range of 600~800ºC.


Equipment name:H section steel strengthening machine  
Model No.:YTJ60B
Application feature:Mainly for correcting the deformation of I beam or H section steel flange plate during welding process,flange width 200-1000mm, flange thickness≤60mm, web height≥350mm


Equipment name:H section flange strengthening machine
Model No.: HYJ-800
Application feature:Mainly for correcting the deformation of I beam or H section steel flange plate during welding process,flange width 160-800mm,flange thickness≤40mm,web height≥160mm

V.Simulated assembly of component
1.Get familiar with component shop drawing and technical requirements.
2.The model components need to re-check by related department after making and finalizing of the model components and then to assemble.
3.Accurate mark-up
4.Inspect the component after first assembly.For multi-group components, pre-assembly for the first group and then batch assembly after qualified test.


VI.Manual welding

VII.Shot blasting

Equipment name:10-ramming heads shot blasting machine

Model No.:QH1525    
Application feature:Mainly for shot blasting of section steels including H section steel, welded members and steel plate,10 ramming head; Machine entry size:1500Í2500 and member at 1200Í2000 size could pass the machine at once; up to Sa2.5 Grade.


VIII.Painting
The surface of the members should be in even,flat, glossy and full painting without manifest of cracking, peeling and pin holing.The color and coating thickness should also meet design requirements.If there is no certain requirements,the following standards should be followed:thickness is 150μm indoor while 125μm outdoor.The allowable deviation is -25μm.The allowable deviation of dry paint film thickness for each-time painting
Two coats of primer:thickness being40±5μm; Two coats of finish paint:thickness being 60±5μm.


Equipment name:Airless sprayer     
Model No.:CPQ9CA
Application feature: Derived capacity:56 L/min,Air consumption:50~1200 L/min.Mainly for surface paint of structural members, Pressure ration: 32:1

 
Process, fabrication and quality control standard on welding groove/beveling of steel structure
1. Purpose
To ensure the welding quality, meeting up the technical requirements of welded members and improve the standardization of our fabrication, we specially formulate this regulation.
2. Application scope
This manual apply for the design, fabricate and inspection of groove joint in terms of manual arc welding, CO2 arch welding, mixed gas arch welding, submerged arc welding and electroslag welding.
3. Design of welding groove
3.1 Key points on design welding groove:
In order to obtain quality groove, it is necessary to choose appropriate form of groove. The option of groove mainly depends on the thickness of base metal, welding method and craftsmanship requirements.The followings are the factors we need to consider:
  1. minimize the amount of filler metal
  2. easy for beveling
  3. in convenience for welding operation and slag removal
  4. After welding stress and deformation should be as small as possible

3.2 Groove direction:
We will consider the following factors for the groove direction:
A)in favor of welding process and removing slag and leave enough space for welding process on the fusion face
B)minimize the times of flip-flop during welding
C)way of fit-up in actual welding

3.3. Regulation on groove direction of members:

3.3.1 Butt welding on H section rafter/column (when CJP-complete joint penetration and single side fusion is required)
1) When there is no welding backing, the groove orientation on flange plates should be same and falls on the direction in favor of welding on web plats(same rules apply for the PJP situation). Please refer to illustration 1
Light Weight Steel Structure Prefab Cabins
2)When there is welding backing, we require the groove direction being outward for the flange plates(opposite direction for web plates) and still falls on the direction in favor of welding on web plates. Please refer to illustration 2
Light Weight Steel Structure Prefab Cabins3)Butt-welding on construction site:we require all the grooves should be bevelled on the upper rafter/column when it comes to bolt connection for web plates(see illustration 3). For the scenario of welding on web plates, please refer to the illustration 4.
Light Weight Steel Structure Prefab CabinsLight Weight Steel Structure Prefab Cabins3.3.2 Box column(groove on itself).See illustration 5

Light Weight Steel Structure Prefab Cabins4. Welding groove form
4.1. Mark on form and size of welding joint groove:
Light Weight Steel Structure Prefab CabinsExample: Shielded metal arch welding, complete joint penetration, butt welding, I shape groove, welding backing and single side weld would be marked MC-BI-BS1
4.2. For the mark of welding method and penetration type, please see the following chart 1.
Chart 1 Mark on welding method and penetration type
Mark Welding method Penetration type
MC Shielded metal arch welding CJP-complete joint penetration
MP PJP-partial joint penetration
GC Shielded arch welding
Self-shielded arc welding
CJP-complete joint penetration
GP PJP-partial joint penetration
SC Submerged arc welding CJP-complete joint penetration
SP PJP-partial joint penetration
SL Electroslag welding  
 4.3. For the mark of single, double side welding and backing material type, please see the following chart 2
Chart 2 Single/double side welding and backing material type mark
Backing material type Single/double side welding
Mark Material Mark Single/double side welding
BS Metal backing 1 Single side welding
BF Other backing 2 Double side welding
4.4. Mark on each part size of groove, see chart 3.
Chart 3 Size mark on groove
Mark Size of each part on groove
t Thickness of welding plate(mm)
b Groove root gap or gap between two members(mm)
h Groove depth(mm)
p Groove roof face(mm)
α Groove angle(º)

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now