• Prefabricated Steel Structural Warehouse Building Materials
  • Prefabricated Steel Structural Warehouse Building Materials
  • Prefabricated Steel Structural Warehouse Building Materials
  • Prefabricated Steel Structural Warehouse Building Materials
  • Prefabricated Steel Structural Warehouse Building Materials
  • Prefabricated Steel Structural Warehouse Building Materials

Prefabricated Steel Structural Warehouse Building Materials

Type: H-Section Steel
Size: According to Customers′ Requirement.
Color Reference: Ral
Member of Engineering Team: 20
Quality Control: SGS
Life Cycle: 50 Years
Customization:
Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company, Group Corporation

Basic Info.

Model NO.
KXD-SSW61
Construction Period
60 Days
Project Management
Turnkey Solution
Engineering Tools
Autocad
Main Steel Frame
H Steel, Z or C Purlin
Delivery Date
About 35 Days
Standard
GB
Trademark
Carbon Structural Steel, KXD
Forming
Hot-Rolled Steel
Connection Form
Bolt Connection
Member
Steel Column
Type of Steel For Building Structure
High-Strength Steel
Carbon Structural Steel
Q235
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Warranty
50 Years Limited Warranty
Transport Package
Seaworthy Package
Specification
SGS / ISO/BV/CE
Origin
China
HS Code
9406900090
Production Capacity
2000ton/Month

Product Description

Prefabricated Steel Structure for warehouse
Qingdao KXD Steel Structure Co.,Ltd, which was founded in 2004, currently has 150,000 square meters production workshop, professional production line and 700employees. We are professionally engaged in steel structure design, manufacture and installation for industry, civil and commercial field, annual production capacity of steel structure is 100000 tons.

KXD's quality products include complete framing systems, wall and roof panel systems and other accessories.

Our new factory showing:
Prefabricated Steel Structural Warehouse Building Materials
Prefabricated Steel Structural Warehouse Building Materials

The total steel structure industrial building project cost is about $500 thousand USD,the whole contract period of 80 days on-site installation and construction of 50 days.It is used as cement production plant.
 
KXD provided design,manufacture and installation services for your clients. Our professional installation team helped local workers to guide the installation.
KXD's expert engineering team, advanced manufacturing factories and professional installation team give us the ability to provide on-stop solution ranging from pre-study, design,architecture,manufacture and installation for our clients.

 
Product packing and loading:
Prefabricated Steel Structural Warehouse Building Materials


Prefabricated Steel Structural Warehouse Building Materials
Prefabricated Steel Structural Warehouse Building Materials
Prefabricated Steel Structural Warehouse Building Materials

Prefabricated Steel Structural Warehouse Building Materials

Name Light Steel Structure Large Span Workshop
Size length* width*high, and the ridge height, slope
Standard GB ISO BV SGS
Usage What will building be used in
Country Which country that the building will be
Design load Wind speed, Snow load, Earthquake
Wall and Roof  Panel or Steel sheet
Insulation Sandwich panel, Fiber glass, Rock wool, PU
Surface Hot dip galvanize or Painted                                                              
Window Quantity, material,dimension(WxH) and position
Door Quantity, material,dimension(WxH) and position
Accessories Down pipe, Out gutter, Ventilator, skylight, etc..

Prefabricated Steel Structural Warehouse Building Materials
Prefabricated Steel Structural Warehouse Building MaterialsPrefabricated Steel Structural Warehouse Building Materials

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now